All Categories : Case Studies Bookmark and Share

Title : Alabama Department of Transportation, The Mobile River Bridge Project, Bentley Systems
Company : Bentley Systems
Date : 11-Apr-2016
Downloads : 6



If download does not start, click here.
Rate This File
5 Stars
4 Stars
3 Stars
2 Stars
1 Star

The I-10 Mobile River Bridge spans the Mobile River near downtown Mobile, Alabama, with a minimum vertical clearance height of 215 feet, making it the second highest clearance bridge in the United States. The Alabama Department of Transportation (ALDOT) used Bentley’s visualization and reality modeling software, LumenRT, to deliver real-time, immersive visualizations for the crucial public involvement meetings.
User Reviews More Reviews Review This File
Jobs
Geospatial Analyst for Vencore at Suitland, MD
Sr. Mechanical Engineer for Kateeva at Newark, CA
Geospatial Intelligence Analyst for Quick Services LLC at Fort Bragg, NC
MECHANICAL ENGINEER for Peter R. Thom and Associates at ORINDA, CA
Mgr Mechanical Engineering 2 for Northrop Grumman at Melbourne, FL
Upcoming Events
Tech Talk: Merge, Identify, and Report Interferences with Clash Detection at 71 Pond View Drive Southbury CT - Jan 17, 2017
Tech Talk: 4 Common Construction Management Mistakes and How to Avoid Them at 71 Pond View Drive Southbury CT - Jan 17, 2017
Tech Talk: Merge, Identify, and Report Interferences with Clash Detection at 71 Pond View Drive Southbury CT - Jan 17, 2017
GRAPHISOFT: ARCHICAD download 30-day FREE trial
Canon
Bentley:Microstation License
CADalog.com - Countless CAD add-ons, plug-ins and more.



Internet Business Systems © 2017 Internet Business Systems, Inc.
595 Millich Dr., Suite 216, Campbell, CA 95008
+1 (408)-337-6870 — Contact Us, or visit our other sites:
TechJobsCafe - Technical Jobs and Resumes EDACafe - Electronic Design Automation GISCafe - Geographical Information Services  MCADCafe - Mechanical Design and Engineering ShareCG - Share Computer Graphic (CG) Animation, 3D Art and 3D Models
  Privacy Policy