All Categories : Case Studies Bookmark and Share

Title : ArcelorMittal Mines Canada Saves CAD 7 Million Annually in the Maintenance Shop
Company : Bentley Systems
File Name : bentley_casestudy_arcelormittal_09.pdf
Size : 5771993
Type : application/pdf
Date : 12-Sep-2013
Downloads : 93

If download does not start, click here.
Rate This File
5 Stars
4 Stars
3 Stars
2 Stars
1 Star

ArcelorMittal Mines Canada is one of the leading producers of iron ore products in North America. The company is comprised of ArcelorMittal Mining Canada G.P. (mine site and pellet plant) and ArcelorMittal Infrastructure Canada G.P. (rail road and port site). The open pit mine and crusher/concentrator facility is capable of producing 18 million metric tons of iron ore concentrates annually at Mont Wright in northern Québec. The company also operates a pellet plant with an annual production capacity of some 9 million metric tons of iron ore pellets at Port-Cartier, Québec.
User Reviews More Reviews Review This File
Bentley:MS TRial

Featured Video
Currently No Featured Jobs
Upcoming Events
Boston Lights Expo & Conference 2016 at Westin Waterfront Hotel 425 Summer Street Boston MA - Oct 26, 2016
BIM and the Smart Home at DCOTA- Crestron Showroom 1855 Griffin Rd #B-108 Dania Beach FL - Oct 27, 2016
Bentley System's Year in Infrastructure Conference at London United Kingdom - Nov 1 - 3, 2016
GRAPHISOFT: ARCHICAD download 30-day FREE trial
Bentley: Microstation Trial
TurboCAD pro : Start at $299 - Countless CAD add-ons, plug-ins and more.

Internet Business Systems © 2016 Internet Business Systems, Inc.
595 Millich Dr., Suite 216, Campbell, CA 95008
+1 (408)-337-6870 — Contact Us, or visit our other sites:
TechJobsCafe - Technical Jobs and Resumes EDACafe - Electronic Design Automation GISCafe - Geographical Information Services  MCADCafe - Mechanical Design and Engineering ShareCG - Share Computer Graphic (CG) Animation, 3D Art and 3D Models
  Privacy Policy