All Categories : Case Studies Bookmark and Share

Title : Asset Performance Management at Tenaga Nasional Berhad Power Plants
Company : Bentley Systems
Date : 25-Feb-2016
Downloads : 65



If download does not start, click here.
Rate This File
5 Stars
4 Stars
3 Stars
2 Stars
1 Star

Over the years, Tenaga Nasional Berhad (TNB), the largest electricity utility in Malaysia, implemented a number of asset performance enhancement initiatives such as reliability centered maintenance, generation plant management, enterprise resource management, and predictive maintenance. However, vital information from these initiatives was contained in multiple databases or paper records, leading to lapses and unexpected failures. TNB launched a USD 2.8 million program to centralize condition-based information for any given asset.
User Reviews More Reviews Review This File
MBA student doing research on Tenaga Nasional information systems - WL Chim - Report As Inappropriate
Featured Video
Jobs
Senior Structural Engineer for Design Everest at San Francisco, CA
Mechanical Engineer for IDEX Corporation at West Jordan,, UT
Business Partner Manager for Cityworks - Azteca Systems, LLC at Sandy, UT
Upcoming Events
32nd RCI International Convention and Trade Show at Anaheim Convention Center Anaheim California - Mar 16 - 21, 2017
2017 Spring BIMForum at Sheraton San Diego Hotel & Marina San Diego California - Apr 3 - 5, 2017
GRAPHISOFT: ARCHICAD download 30-day FREE trial
Graphisoft ARCHICAD  Download a 30-Day FREE trial
TurboCAD pro : Start at $299
CADalog.com - Countless CAD add-ons, plug-ins and more.



Internet Business Systems © 2016 Internet Business Systems, Inc.
595 Millich Dr., Suite 216, Campbell, CA 95008
+1 (408)-337-6870 — Contact Us, or visit our other sites:
TechJobsCafe - Technical Jobs and Resumes EDACafe - Electronic Design Automation GISCafe - Geographical Information Services  MCADCafe - Mechanical Design and Engineering ShareCG - Share Computer Graphic (CG) Animation, 3D Art and 3D Models
  Privacy Policy