All Categories : Case Studies Bookmark and Share

Title : Gippsland Water Factory Alliance Uses AutoPLANT on Wastewater Treatment Facility
Company : Bentley Systems
Date : 27-Aug-2012
Downloads : 169



If download does not start, click here.
Rate This File
5 Stars
4 Stars
3 Stars
2 Stars
1 Star

Sustainable Wastewater Treatment Infrastructure Ends 60-year-old Environmental Disaster The (AUD) $260 million Gippsland Water Factory was designed to provide a sustainable and economically responsible solution. AutoPLANT, Bentley’s premier plant design engineering suite, helped to keep costs down by streamlining workflows, reducing design time, facilitating procurement, and producing as-built models for lifecycle asset management.
User Reviews More Reviews Review This File

Jobs
Currently No Featured Jobs
Upcoming Events
Solidworks World 2015 from Feb. 8 - 11, 2015 Phoenix Convention Center, Phoenix, AZ at Phoenix Convention Center 100 N 3rd St, AZ - Feb 8 - 11, 2015
International LiDAR Mapping Forum at Denver CO - Feb 23 - 25, 2015
GRAPHISOFT
Bentley:Transform Project Delivery ProjectWise
CADalog.com - Countless CAD add-ons, plug-ins and more.



Click here for Internet Business Systems © 2014 Internet Business Systems, Inc.
595 Millich Dr., Suite 210, Campbell, CA 95008
+1 (408) 850-9202 — Contact Us, or visit our other sites:
TechJobsCafe - Technical Jobs and ResumesEDACafe - Electronic Design AutomationGISCafe - Geographical Information Services	MCADCafe - Mechanical Design and EngineeringShareCG  - Share Computer Graphic (CG) Animation, 3D Art and 3D Models
  Privacy Policy