All Categories : Case Studies Bookmark and Share

Title : Gippsland Water Factory Alliance Uses AutoPLANT on Wastewater Treatment Facility
Company : Bentley Systems
Date : 27-Aug-2012
Downloads : 172



If download does not start, click here.
Rate This File
5 Stars
4 Stars
3 Stars
2 Stars
1 Star

Sustainable Wastewater Treatment Infrastructure Ends 60-year-old Environmental Disaster The (AUD) $260 million Gippsland Water Factory was designed to provide a sustainable and economically responsible solution. AutoPLANT, Bentley’s premier plant design engineering suite, helped to keep costs down by streamlining workflows, reducing design time, facilitating procurement, and producing as-built models for lifecycle asset management.
User Reviews More Reviews Review This File
 Benteley


Featured Video
Jobs
Optical Tasking Engineer for Airbus Defense and Space Geo-Intelligence at Chantilly, VA
Upcoming Events
CONNECTION EVENT BEIJING at Beijing China - Aug 6 - 7, 2015
SIGGRAPH 2015 at Los Angeles Convention Center 1201 S Figueroa St, Los Angeles CA - Aug 9 - 13, 2015
InspectTech Special Interest Group at United States - Aug 12, 2015
Canon: Productive All in one Large format printing
GRAPHISOFT: ARCHICAD download 30-day FREE trial
Bentley: Get Connected
CADalog.com - Countless CAD add-ons, plug-ins and more.



Internet Business Systems © 2015 Internet Business Systems, Inc.
595 Millich Dr., Suite 210, Campbell, CA 95008
+1 (408) 850-9202 — Contact Us, or visit our other sites:
TechJobsCafe - Technical Jobs and Resumes EDACafe - Electronic Design Automation GISCafe - Geographical Information Services  MCADCafe - Mechanical Design and Engineering ShareCG - Share Computer Graphic (CG) Animation, 3D Art and 3D Models
  Privacy Policy