All Categories : Case Studies Bookmark and Share

Title : Gippsland Water Factory Alliance Uses AutoPLANT on Wastewater Treatment Facility
Company : Bentley Systems
Date : 27-Aug-2012
Downloads : 166



If download does not start, click here.
Rate This File
5 Stars
4 Stars
3 Stars
2 Stars
1 Star

Sustainable Wastewater Treatment Infrastructure Ends 60-year-old Environmental Disaster The (AUD) $260 million Gippsland Water Factory was designed to provide a sustainable and economically responsible solution. AutoPLANT, Bentley’s premier plant design engineering suite, helped to keep costs down by streamlining workflows, reducing design time, facilitating procurement, and producing as-built models for lifecycle asset management.
User Reviews More Reviews Review This File


Featured Video
Jobs
GIS Architect for CambridgeSystematics at Cambridge, MA
Senior Geospatial Analyst for IHS Energy Premier at Arvada, CO
Manufacturing Operations Lead for D E Shaw Research at New York City, NY
Pipeline Integrity Specialist for Ameren at Decatur, IL
Engineering Program Managers for D E Shaw Research at New York City, NY
Head of Engineering Program Management for D E Shaw Research at New York City, NY
Upcoming Events
Bentley: Advances in ProSteel at United States - Sep 24, 2014
WAF event at Marina Bay Sands Singapore - Oct 1 - 3, 2014
The South Florida GIS Expo at FL - Oct 2 - 3, 2014
2014 South Florida GIS Expo Conference at 650 Okeechobee Boulevard West Palm Beach FL - Oct 2 - 3, 2014
GRAPHISOFT
Bentley:



Click here for Internet Business Systems © 2014 Internet Business Systems, Inc.
595 Millich Dr., Suite 210, Campbell, CA 95008
+1 (408) 850-9202 — Contact Us, or visit our other sites:
TechJobsCafe - Technical Jobs and ResumesEDACafe - Electronic Design AutomationGISCafe - Geographical Information Services	MCADCafe - Mechanical Design and EngineeringShareCG  - Share Computer Graphic (CG) Animation, 3D Art and 3D Models
  Privacy Policy