All Categories : Case Studies Bookmark and Share

Title : Guangdong Electric Power Design Institute Standardizes on Bentley on $730 Million Project
Company : Bentley Systems
Date : 31-Jul-2012
Downloads : 95

If download does not start, click here.
Rate This File
5 Stars
4 Stars
3 Stars
2 Stars
1 Star

Bentley software enabled GEDI to improve productivity by 10 percent and reduce the probability of clashes by 90 percent.
User Reviews More Reviews Review This File

3D Geospatial Specialist for Vricon at McLean, VA
Upcoming Events
The Buildings Show at 222 Bremner Blvd Toronto Ontario Canada - Dec 2 - 4, 2015
IIDEXCanada at 255 Front Street West Toronto ON Canada - Dec 2 - 3, 2015
Webinar: Energizing Heritage Conservation with ARCHICAD Point Clouds and BIM at 60 Hickory Drive 1st Floor Waltham MA - Dec 8, 2015
Canon: Productive All in one Large format printing
Bentley: BIM - Countless CAD add-ons, plug-ins and more.

Internet Business Systems © 2015 Internet Business Systems, Inc.
595 Millich Dr., Suite 210, Campbell, CA 95008
+1 (408) 850-9202 — Contact Us, or visit our other sites:
TechJobsCafe - Technical Jobs and Resumes EDACafe - Electronic Design Automation GISCafe - Geographical Information Services  MCADCafe - Mechanical Design and Engineering ShareCG - Share Computer Graphic (CG) Animation, 3D Art and 3D Models
  Privacy Policy