All Categories : Case Studies Bookmark and Share

Title : HDR Tappan Zee Hudson River Crossing: The New New York Bridge, Bentley Systems
Company : Bentley Systems
Date : 30-Mar-2016
Downloads : 28

If download does not start, click here.
Rate This File
5 Stars
4 Stars
3 Stars
2 Stars
1 Star

HDR was awarded the contract to design and build the new New York Bridge – which will replace the traffic-jammed Tappan Zee Bridge – on an aggressive schedule. In addition to crossing the Hudson River at one of its widest points, the design included twin tower cable-stayed main spans with 1,200-foot center spans, four traffic lanes, shoulders and emergency lanes, electronic tolling facilities, a shared-use path, and space for future mass transit. The owners also required an as-designed model and a complete, as-constructed database of assets derived from and tied to a 3D model
User Reviews More Reviews Review This File
Bentley:MS TRial

Featured Video
Currently No Featured Jobs
Upcoming Events
Boston Lights Expo & Conference 2016 at Westin Waterfront Hotel 425 Summer Street Boston MA - Oct 26, 2016
BIM and the Smart Home at DCOTA- Crestron Showroom 1855 Griffin Rd #B-108 Dania Beach FL - Oct 27, 2016
Bentley System's Year in Infrastructure Conference at London United Kingdom - Nov 1 - 3, 2016
GRAPHISOFT: ARCHICAD download 30-day FREE trial
Bentley: YII 2016
TurboCAD pro : Start at $299 - Countless CAD add-ons, plug-ins and more.

Internet Business Systems © 2016 Internet Business Systems, Inc.
595 Millich Dr., Suite 216, Campbell, CA 95008
+1 (408)-337-6870 — Contact Us, or visit our other sites:
TechJobsCafe - Technical Jobs and Resumes EDACafe - Electronic Design Automation GISCafe - Geographical Information Services  MCADCafe - Mechanical Design and Engineering ShareCG - Share Computer Graphic (CG) Animation, 3D Art and 3D Models
  Privacy Policy