All Categories : Case Studies Bookmark and Share

Title : Los Angeles Department of Water and Power Achieves $800,000 in Annual Savings with Bentley’s ProjectWise
Company : Bentley Systems
Date : 31-May-2014
Downloads : 7

Rate This File
5 Stars
4 Stars
3 Stars
2 Stars
1 Star

When the Los Angeles Department of Water and Power(LADWP) surveyed its many stand-alone engineering data repositories, it saw an opportunity to drastically improve its operating efficiency. Eight months later, after implementing ProjectWise®, LADWP’s engineering information management was transformed, dramatically improving the efficiency of engineers, designers, drafters, and construction crews.
User Reviews More Reviews Review This File
Featured Video
Currently No Featured Jobs
Upcoming Events
Boston Lights Expo & Conference 2016 at Westin Waterfront Hotel 425 Summer Street Boston MA - Oct 26, 2016
BIM and the Smart Home at DCOTA- Crestron Showroom 1855 Griffin Rd #B-108 Dania Beach FL - Oct 27, 2016
Bentley System's Year in Infrastructure Conference at London United Kingdom - Nov 1 - 3, 2016
GRAPHISOFT: ARCHICAD download 30-day FREE trial
TurboCAD pro : Start at $299 - Countless CAD add-ons, plug-ins and more.

Internet Business Systems © 2016 Internet Business Systems, Inc.
595 Millich Dr., Suite 216, Campbell, CA 95008
+1 (408)-337-6870 — Contact Us, or visit our other sites:
TechJobsCafe - Technical Jobs and Resumes EDACafe - Electronic Design Automation GISCafe - Geographical Information Services  MCADCafe - Mechanical Design and Engineering ShareCG - Share Computer Graphic (CG) Animation, 3D Art and 3D Models
  Privacy Policy