|
||||||||
|
The implementation and the use of Plant-4D within the Litwin design office was very quick. The operators were very impressed with the software's ease of use and the speed to generate 3D models. These models are immediately used by the commercial department as a pre-sale presentation. Today, the technical departments of Litwin can produce small "helicopter view" animations of the 3D model. After the signing of the contract, the 3D model is used for more detailed design. The project can be completed with the isometrics generating maximum time savings, as the vice-president, Eric Lecesne, explained.
|
|
|||||||
|
|
||||||||
|
||||||||