Downloads -> Case Studies

OSi Uses Bentley Map Bentley Systems 1821-Sep-2015
JLP Delivers Railway Tunnel Clearance Modifications at minimal Cost Bentley Systems 1214-Sep-2015
MOSES Minimizes Redundant Steel in ORCA Offshore's Analysis Bentley Systems 1810-Aug-2015
Eastman Deploys ProjectWise® to Drive Collaboration, Greater Efficiency, and Cost Savings PopularBentley Systems 6503-Aug-2015
John McAslan + Partners Uses 3D Modeling to Facilitate Design of Kings Cross Station PopularBentley Systems 3525-Mar-2015
Case Study: STAAD.Pro Saves $400,000 on Hamon Air-cooling Island Design PopularBentley Systems 2911-Nov-2014
Cast Study: CostEffective Leak Indentification using WaterGEMS PopularBentley Systems 6611-Nov-2014
Foster + Partners Competes for Gold at the SSE Hydro in Glasgow PopularBentley Systems 15810-Jul-2014
gINT Supports Comprehensive Geotechnical Information Management System for the Municipality of Abu Dhabi City PopularBentley Systems 8302-Jun-2014
Bentley Federated GIS Based on Bentley Map Enables Cancún to Collect 66 Percent More Property Tax PopularBentley Systems 5016-May-2014
Information Mobility Helps Deliver Award-winning Project PopularBentley Systems 3125-Feb-2014
Sweco’s ‘Live BIM’ Railway Project Significantly Improves Efficiency on Hallandsås Project PopularBentley Systems 6717-Jan-2014
GEA Process Engineering France Uses ProjectWise to Drive Global Project Collaboration and Business Growth PopularBentley Systems 3904-Dec-2013
Lessons learned from the London 2012 Games construction project PopularBentley Systems 11619-Nov-2013
Hitachi-GE Nuclear Energy Builds MicroStationpowered Integrated Plant Construction System PopularBentley Systems 4330-Sep-2013
Napier City Council Chooses Bentley Platform to Reduce Costs and Increase Data Reuse PopularBentley Systems 6118-Sep-2013
ArcelorMittal Mines Canada Saves CAD 7 Million Annually in the Maintenance Shop PopularBentley Systems 9012-Sep-2013
ProjectWise Increases Efficiency by Enabling Fast access to 10 million Engineering Documents PopularBentley Systems 9723-Jul-2013
Nippon Steel & Sumikin Engineering Uses Bentley SACS Software to Design Innovative Offshore Runway in Tokyo PopularBentley Systems 5505-Jun-2013
AutoPLANT and ProjectWise Integration Cuts Enogex Project Delivery Time by 25 Percent PopularBentley Systems 8304-Jun-2013
Pacific Gas and Electric Company Achieves USD 5.7 Million in Annual Savings with Bentley(R) Substation PopularBentley Systems 5803-Jun-2013
China Nerin Engineering Improves Efficiency by 20 Percent with Bentley’s 3D Design Technology PopularBentley Systems 19928-Feb-2013
WSDOT Uses MicroStation Visualizations to Expedite Selection of SR 20 Sharpes Corner Intersection Design PopularBentley Systems 9920-Feb-2013
Port of Helsinki’s Maintenance System Inspires Productivity Increase and Return on Information PopularBentley Systems 5628-Jan-2013
SimTejo Implements Real-time Integrated System to Accurately Predict Sewer Overflows in Lisbon’s Water Network PopularBentley Systems 5322-Oct-2012
i-TEN Associates Uses Bentley MicroStation to Deliver Highly Accurate 3D Models from Point-cloud Data PopularBentley Systems 4511-Oct-2012
L&T-Sargent & Lundy Uses Bentley’s MicroStation for 3D Design of Supercritical Power Plant in India PopularBentley Systems 9311-Sep-2012
Gippsland Water Factory Alliance Uses AutoPLANT on Wastewater Treatment Facility PopularBentley Systems 17227-Aug-2012
International Power plc Achieves 450-times Return on Software Investment With WaterCAD PopularBentley Systems 7613-Aug-2012
Sri Lanka Survey Department Deploys Bentley Map for Digital Topographic Mapping PopularBentley Systems 16113-Aug-2012
The Shard at London Bridge Quarter – WSP PopularBentley Systems 11610-Aug-2012
Guangdong Electric Power Design Institute Standardizes on Bentley on $730 Million Project PopularBentley Systems 9531-Jul-2012
Learning Legacy Study: Bentley ProjectWise Featured in London "Learning Legacy" Study: Read It Now! PopularBentley Systems 7330-Jul-2012
Edge Structures Serves Ace in Design of Wimbledon Stadium Improvements PopularBentley Systems 8327-Jul-2012
SEI Engineering Uses 3D Models to Accelerate Design, Review, and Approval PopularBentley Systems 8324-Jul-2012
Precision Contracting Services Deploys Bentley’s Communications Products PopularBentley Systems 5315-Feb-2012
Constellation Energy Upgrades to Electronic Performance Improvement Center Using Bentley’s eB PopularBentley Systems 5131-Jan-2012
eB Streamlines Document and Records Management to Significantly Improve Regulatory Rating PopularBentley Systems 7331-Jan-2012
LENC Increases Productivity and Design Efficiency for São Paulo Road Redesign PopularBentley Systems 9005-Aug-2011
City Information Modeling for Sustaining Cities - Bentley Systems PopularBentley Systems 8604-Aug-2011
The Tablet Connection: Connecting BIM to Commissioning, Handover and Operations PopularMotion Computing 4605-Nov-2010
2009 Year In Infrastructure PopularBentley Systems 3923-May-2010
Three Storey Concrete Building Analysis and Design Example with Seismic Provisions (including a reinforced concrete squat wall). PopularSoftek Services Ltd. 72510-Jul-2008
iSAT Network Engineers Design Substations 40% Faster with the Bentley Substation Solution Bentley Systems 1227-Jul-2015
AG5 Uses AECOsim Building Designer Bentley Systems 2622-Jul-2015
PowerCivil for Brazil Shifts Sotepa's Focus from Software to Solutions Bentley Systems 2211-Jun-2015
Arcelor Mittal Burns Harbor Bentley Systems 1202-Apr-2015
Building Studio Bentley Systems 1201-Apr-2015
L&T-Valdel used Bentley software to analyze the module for all static and dynamic loads observed during pre-service and in-service conditions. Bentley Systems 323-Mar-2015
Bentely Software helps Overcome Design Challenges of Innovative BHAU Institute Bentley Systems 1127-Feb-2015
Bentley Software Helps Reduce OSX-3 FPSO Topside Steel Weight by 10 Percent Bentley Systems 1027-Feb-2015
Case Study: WaterCAD helps Sabesp Identify Optimal Hydraulic strategy Bentley Systems 2411-Nov-2014
Fitzpatrick Engineering Group Uses Bentley BIM Software for Major Structural Design Project Bentley Systems 1508-Oct-2014
STAAD.Pro Saves USD 400,000 on Hamon Air-cooling Island Design Bentley Systems 1308-Oct-2014
Structural Modeler Coordinates 3D Design of World's Tallest Ferris Wheel Bentley Systems 1408-Oct-2014
WaterCAD Helps Sabesp Identify Optimal Hydraulic Strategy, Solving Water Supply Issues Bentley Systems 908-Oct-2014
ArcelorMittal Burns Harbor Operation Uses AssetWise Performance Management to Achieve USD 2.1 Million in Savings in One Year Bentley Systems 2630-Apr-2014
ScottishPower Strategy for Asset Management and Process Safety Bentley Systems 930-Apr-2014
InRoads® Modeling Enables Mortenson Construction to Shrink Wind Farm Footprint. Bentley Systems 1728-Jan-2014
Parsons Brinckerhoff and Arup Use Bentley Software to Create Australia’s Largest Road Project Bentley Systems 2628-Jan-2014
RM Bridge Enables Armando Rito Engenharia to Improve Quality of Life in Angola Bentley Systems 2228-Jan-2014
Bristol Water Improves Business Performance with Enterprise Management of Street Works Noticing Bentley Systems 1117-Jan-2014
Robin Partington & Partners Leverages Bentley Software to Create Curvilinear Park House Bentley Systems 1517-Jan-2014
InRoads® Modeling Enables Mortenson Construction to Shrink Wind Farm Footprint Bentley Systems 2617-Dec-2013
Bristol Water Improves Business Performance with Enterprise Management of Street Works Noticing Bentley Systems 1713-Dec-2013
Turner & Townsend exactal asia limited 201-Jul-2013
Nippon Steel & Sumikin Engineering Uses Bentley SACS Software to Design Innovative Offshore Runway in Tokyo Bentley Systems 117-Jun-2013
Los Angeles Department of Water and Power Achieves $800,000 in Annual Savings with Bentley’s ProjectWise Bentley Systems 731-May-2012
As Nature Intended, With Alphacam Planit 131-Jan-2012
Customized Services leads to win-win relationship POSDATA, Inc 020-Dec-2011
Refresh Deployment Goes Hand-In-Hand with Reverse Logistics Processes POSDATA, Inc 020-Dec-2011
Retail Chain Finds Their Solution with POSDATA POSDATA, Inc 020-Dec-2011
Service Provider Counts on POSDATA POSDATA, Inc 020-Dec-2011
Concept design T-Splines, Inc. 1725-Nov-2011
Free form design for molded consumer products T-Splines, Inc. 125-Nov-2011
T-Splines accelerates complex architectural shape development T-Splines, Inc. 225-Nov-2011
SITEOPS® helps Map Limited win projects valued at $32 Million BLUERIDGE Analytics 320-Nov-2011
Snowbound’s RasterMaster SDK Breathes New Life into Hospital’s EMR System Snowbound Software 117-Nov-2011
Boilers ANALISIS-DSC 109-Nov-2011
Chemical Sector ANALISIS-DSC 009-Nov-2011
California Lottery Wins Big with Integrated Project Delivery Ideate, Inc. 623-Oct-2011
Koutsoftides Architects GRAPHISOFT 223-Oct-2011
The Ark Building GRAPHISOFT 923-Oct-2011
The Darmstadtium GRAPHISOFT 223-Oct-2011
The Changing Face of Partnering Project 3 Technologies 101-Aug-2011
Mitchell Brandtman exactal asia limited 101-Jul-2011
Multi Span Australia exactal asia limited 101-Jul-2011
Newton Kerr and Partners exactal asia limited 001-Jul-2011
The J Companies uses ProjectXnet Cloud Hosting Service to enhance Efficiency and reduce Operating Cost. The Cram Group 108-Jun-2011
Doster Construction Deploys Motion Tablet PCs, Reduces Process Time from Weeks to Just Days Motion Computing 505-Nov-2010
F5 Tablet PCs Eliminate Communications Delays Saving Time and Money Motion Computing 805-Nov-2010
United Water Adopts Innovative Modeling Processes to Improve Water System Management Bentley Systems 025-Aug-2010
Engineering the 21st Century Utility: A Changing Industry Bentley Systems 127-Jul-2010
Bentley Systems Helps Iberdrola Ingeniería Y Construcción Design Substations Faster With New Intelligent Substation Design Software Bentley Systems 015-Jun-2010
Allergan Pharmaceuticals Cleanroom IES CONSULTING 112-Jun-2010
AEI, Trevor Pearcy Building, Australia Case Study IES CONSULTING 004-Jun-2010
SYNERGY for Architects (Case Study: Alex Popov & Associates) Total Synergy Solutions Inc. 003-Mar-2010
SYNERGY for Architects (Case Study: Cottee Parker Architects) Total Synergy Solutions Inc. 603-Mar-2010
SYNERGY for Architects (Case Study: Scott Carver Architects) Total Synergy Solutions Inc. 103-Mar-2010
SYNERGY for Engineers (Case Study: Kehoe Myers Consulting Engineers) Total Synergy Solutions Inc. 103-Mar-2010
SYNERGY for Engineers (Case Study: Klopfer Dobos Pty Ltd) Total Synergy Solutions Inc. 003-Mar-2010
Bluebeam Saves the Day for Telluride eGroup at the 2009 Greenbuild Conference & Expo Bluebeam Software, Inc. 102-Mar-2010
GLY Construction Gets More with Bluebeam PDF Revu Bluebeam Software, Inc. 202-Mar-2010
Putting Bluebeam’s Takeoff Tools to the Test: Quantity Surveyor Calculates Takeoffs 70% Faster with Revu Bluebeam Software, Inc. 002-Mar-2010
The Terranea Resort Project Team Uses Bluebeam PDF Revu for Punchlists and Back Checks Bluebeam Software, Inc. 102-Mar-2010
KLC School of Design Makes the Grade with Vectorworks Nemetschek VectorWorks 113-Feb-2010
Creating Sustainable Designs With Vectorworks Architect Nemetschek VectorWorks 707-Feb-2010
Vectorworks Helps Revitalize Amherst College Nemetschek VectorWorks 030-Jan-2010
Vectorworks Turns Architecture into Art Nemetschek VectorWorks 223-Jan-2010
Managing a Multifaceted Project with Vectorworks Architect Nemetschek VectorWorks 616-Jan-2010
Finding a Better Way to Work with Vectorworks Adobe PDF Support Nemetschek VectorWorks 009-Jan-2010
Renovating the Bundeshaus with Vectorworks Architect Nemetschek VectorWorks 202-Jan-2010
Dirtworks, PC, Designs a Living Classroom with the Help of Vectorworks Landmark Nemetschek VectorWorks 226-Dec-2009
Vectorworks Designer Helps Bring 007 to the Big Screen Nemetschek VectorWorks 519-Dec-2009
Vectorworks, Vectorworks Spotlight And Renderworks Team Up To Help Bring The Ben Franklin's Ghost Exhibit To Life Nemetschek VectorWorks 206-Dec-2009
Vectorworks Spotlight Lights Up Metallica on Tour Nemetschek VectorWorks 028-Nov-2009
Vectorworks Spotlight Goes for the Gold at Australia's Commonwealth Games Nemetschek VectorWorks 421-Nov-2009
Vectorworks helps Create Hip Space for High-fashion Crowd Nemetschek VectorWorks 214-Nov-2009
Working to Save the Amazon Rainforest with Vectorworks Landmark Nemetschek VectorWorks 107-Nov-2009
The Sky is the Limit with Vectorworks Architect Nemetschek VectorWorks 931-Oct-2009
Conquering the Kauai Flood Zone with Vectorworks Designer Nemetschek VectorWorks 124-Oct-2009
Vectorworks Designer Helps Bring the Universe Down to Earth Nemetschek VectorWorks 218-Oct-2009
Vectorworks Architect Helps Home Theater Design Firm Work Smarter in 3D Nemetschek VectorWorks 110-Oct-2009
Vectorworks Architect Revives the Venice International Film Festival Nemetschek VectorWorks 203-Oct-2009
Active Construction Cuts Overhead by $75,000 to $100,000 a Year with the Help of Dexter + Chaney and Spectrum™ Dexter & Chaney, Inc. 230-Sep-2009
Design Tec Job Costing Software Case Study WennSoft 027-Sep-2009
Vectorworks is an All-in-one Solution for Building High-tech Trade Show Exhibits Nemetschek VectorWorks 227-Sep-2009
Four Simple Ways to Be a More Effective Manager SmartDraw.Com 619-Sep-2009
Vectorworks Architect on Broadway Nemetschek VectorWorks 219-Sep-2009
BID2WIN Estimating & Bidding Keeps Sommers Engineering a Low Bidder in a Tough Economy BID2WIN Software, Inc. 416-Sep-2009
BID2WIN is Instrumental in Winning Every Job at Equipt, Inc. BID2WIN Software, Inc. 116-Sep-2009
BID2WIN's Versatility Instills Confidence in BA Blacktop's Estimating and Bidding BID2WIN Software, Inc. 116-Sep-2009
C.S. McCrossan Increases Productivity with BID2WIN and BUILD2WIN BID2WIN Software, Inc. 116-Sep-2009
Vectorworks Architect Beats AutoCAD in Design-Build Competition Nemetschek VectorWorks 1212-Sep-2009
Vectorworks Architect Helps Reinvent Videoconferencing Nemetschek VectorWorks 205-Sep-2009
Vectorworks Helped Create the Winning Entry to the Miami Monument Competition Nemetschek VectorWorks 229-Aug-2009
Vectorworks Helps Landscape Architect Go to Press Nemetschek VectorWorks 322-Aug-2009
Vectorworks Brings Daniel Libeskind’s Futuropolis to Life Nemetschek VectorWorks 1016-Aug-2009
Vectorworks Proves Versatile For Cutting-Edge New York City Design Firm Nemetschek VectorWorks 108-Aug-2009
Vectorworks Architect Gives More Design Freedom to Custom Home Architects Nemetschek VectorWorks 301-Aug-2009
PWP Landscape Architecture Puts Vectorworks Landmark in its Master Plan Nemetschek VectorWorks 225-Jul-2009
Vectorworks "Trumps" Tower Signage Challenge Nemetschek VectorWorks 618-Jul-2009
Asset Management Solution Provides Time and Cost Savings Accela, Inc. 806-Jul-2009
New Hosted Service Provides Cost Savings Accela, Inc. 306-Jul-2009
Vectorworks Helps Stage the 2008 GRAMMY Celebration Nemetschek VectorWorks 204-Jul-2009
Graham Landscape Architecture Uses Vectorworks Landmark to see both the Forest and the Trees Nemetschek VectorWorks 220-Jun-2009
Vectorworks Spotlight Helps The Daily Show Deliver on Cue Nemetschek VectorWorks 213-Jun-2009
Henn Architects: Built for Speed with VectorWorks Architect Nemetschek VectorWorks 506-Jun-2009
Océ Solutions at HGA Architects & Engineers Océ North America, Inc. 503-Jun-2009
VectorWorks Rejuvenates the Town of Spa, Belgium Nemetschek VectorWorks 330-May-2009
Vectorworks Landmark Helps Behnke Nurseries with a Project for Extreme Makeover: Home Edition Nemetschek VectorWorks 523-May-2009
Putting Projects into Perspective: rojo Architecture Designs in 3D using Vectorworks Architect Nemetschek VectorWorks 616-May-2009
Messana O’Rorke Architects Unite Past and Present using Vectorworks Architect Nemetschek VectorWorks 312-May-2009
An Investment in Success: A New England Contractor's Story UDA Technologies, Inc. 208-Mar-2009
Eliminating the Complicated A Lifetime of Experience Leads to UDA ConstructionSuite UDA Technologies, Inc. 208-Mar-2009
From Builder to Businessman UDA ConstructionOffice Transforms Third-Generation North Carolina Contractor UDA Technologies, Inc. 108-Mar-2009
From Small Time to Prime Time ConstructionSuite User Featured on HGTV's Televison Show "Curb Appeal" UDA Technologies, Inc. 108-Mar-2009
Stepping up to the Major Leagues Florida Builder Hits Home Run with ConstructionOffice UDA Technologies, Inc. 608-Mar-2009
Time is Money Illinois Company Sees Tangible Benefits with ConstructionOffice UDA Technologies, Inc. 508-Mar-2009
2D Runoff Modeling - A Pipe Dream or the Future? Wallingford Software Ltd 607-Mar-2009
Determination of overland flow path lines using a hydrodynamic 2D model Wallingford Software Ltd 307-Mar-2009
InfoWorks RS forms basis for flood map of Northern Ireland Wallingford Software Ltd 307-Mar-2009
Predictive DG5 at risk register Wallingford Software Ltd 207-Mar-2009
Spatial data applications from InfoWorks WS models Wallingford Software Ltd 407-Mar-2009
Sydney Water reaps the benefits of modeling integration Wallingford Software Ltd 807-Mar-2009
The use of radar rainfall data in Scotland? Wallingford Software Ltd 507-Mar-2009
United Utilities adopts Infoworks CS 2D to develop Penketh flood alleviation plans Wallingford Software Ltd 207-Mar-2009
Using InfoNet for efficient model building in eastern England Wallingford Software Ltd 307-Mar-2009
UTI Speeds Design Approval Utilizing AutoTURN Technology Transoft Solutions Inc. 307-Mar-2009
Atlantic United Construction Synergy Business Solutions 105-Mar-2009
Better Project Accounting a Strategic Asset for Construction Firm Synergy Business Solutions 405-Mar-2009
Operational efficiencies help interior design firm cope with the economic downturn WennSoft 205-Mar-2009
Reducing Costs and Payroll While Improving Customer Service WennSoft 205-Mar-2009
Maintaining quality Residential Properties Brings Millions of Dollars in Savings Latista Technologies, Inc. 503-Mar-2009
Quality assurance on the Job site requires quality software in the field Latista Technologies, Inc. 303-Mar-2009
Software solutions help put baseball back in the nation’s capital Latista Technologies, Inc. 203-Mar-2009
Standardized checklist processes let inspectors focus on what really matters Latista Technologies, Inc. 303-Mar-2009
IDL Mathematical Capabilities Allow k-Space Associates to Assess Real-Time, Thin-Film Quality ITT Visual Information Solutions 101-Mar-2009
XEROX Organic Thin Film Transistor Manufacturing Breakthrough - IDL and LabView Working Together ITT Visual Information Solutions 201-Mar-2009
IHS Standards Expert™ IHS 428-Feb-2009
Pemex Engineers Save Time with Instant Access to Online Standards Library IHS 228-Feb-2009
IRS Audit Goes Smoothly for Metro Electric - thanks to Spectrum Document Imaging Dexter & Chaney, Inc. 320-Feb-2009
Case Study: Encon, Inc. Data-Basics 319-Feb-2009
Case Study: Harris Electric Data-Basics 119-Feb-2009
Delivering P2P Process Improvement Management Briefing Papers Construction Industry Solutions (Shaker) Corp. 113-Feb-2009
Document Locator helps North Davis County Sewer District effectively manage water testing and analysis to meet regulatory requirements. ColumbiaSoft 512-Feb-2009
BSD CostLink/AE Helps Gillis and Associates Produce Accurate and Timely Budgets Building Systems Design, Inc. 108-Feb-2009
SpecLink’s Up-To-Date Reference Standards Helps Waterleaf Architecture Stay Ahead Building Systems Design, Inc. 208-Feb-2009
Svigals + Partners Brings Specification Writing In-House with BSD SpecLink 3520 Piedmont Road, Suite 415 Atlanta, GA 30305 888-BSD- Building Systems Design, Inc. 108-Feb-2009
First National Bank of Omaha— In Their Own Words BRG | Business Resource Group 507-Feb-2009
Apopka Relief High School, Kenpat USA, LLC On Center Software 406-Feb-2009
Hubbell, Inc. Improves Project Tracking with BUILD2WIN BID2WIN Software, Inc. 206-Feb-2009
Kansas City Chiefs' Arrowhead Stadium, Compusult, Inc. On Center Software 506-Feb-2009
R & R Contracting finds success with BUILD2WIN Field Tracking BID2WIN Software, Inc. 106-Feb-2009
St. Mary's Grand Junction, McCarthy Building Companies, Inc. On Center Software 206-Feb-2009
Supply and Installation of Natural Stone Finishes, GemStar Group, Inc. On Center Software 106-Feb-2009
Applecross Properties Ltd. Queen Margaret Drive Project Adroitec Information Systems Ltd 202-Feb-2009
Kamppi Center Project Adroitec Information Systems Ltd 402-Feb-2009
Oy Alfred A. Palmberg Ab Varma Salmisaari project Adroitec Information Systems Ltd 302-Feb-2009
Q&D Construction & Swinerton Builders Ritz Carlton Highlands Lodge, Resort and Spa Adroitec Information Systems Ltd 602-Feb-2009
Applecross Properties Ltd. - Queen Margaret Drive Project, UK Vico Software, Inc. 210-Jul-2008
Beam Model vs FE Model Softek Services Ltd. 1010-Jul-2008
Kaiser Permanente Undertakes a Seismic Shift in Capital Planning Management Skire, Inc 410-Jul-2008
Oy Alfred A. Palmberg Ab - Varma Salmisaari Project Vico Software, Inc. 210-Jul-2008
Peoria, Arizona Standardizes Processes and Simplifies Project Funding Tracking Skire, Inc 210-Jul-2008
Project management applications can help ensure massive construction endeavors don’t spin out of financial control Skire, Inc 510-Jul-2008
Q&D Construction & Swinerton Builders Vico Software, Inc. 410-Jul-2008
Ripley Entertainment, Inc. WennSoft 310-Jul-2008
Skire’s Unifier™ Drives Global Efficiencies for Wrigley Skire, Inc 110-Jul-2008
SRV Group - Kamppi Center Project Vico Software, Inc. 410-Jul-2008
Submission to the AIA TAP Knowledge Community, First Annual BIM Awards Competition Solibri, Inc. 510-Jul-2008
Customer Case Study: Scott Contracting, Inc. Equential 109-Jul-2008
Customer Case Study: SelectBuild Equential 109-Jul-2008
Reputable Rental House finds lost revenue with TITAN DPL America 409-Jul-2008
Alterman Electric Saves Time, Increases Revenue with Spectrum Electronic Substantiated Billing Dexter & Chaney, Inc. 208-Jul-2008
Spectrum™ Construction Management Software Gives Missouri Contractor More Info in Less Time Dexter & Chaney, Inc. 308-Jul-2008
BE&K uses AVEVA Laser Model Interface to reduce steps when dealing with 'existing conditions' in 3D plant modelling Aveva Group Plc 705-Jul-2008
Comprehensive All-Pipe Fire Flow Modeling MWH Soft 105-Jul-2008
Comprehensive Water System Integration MWH Soft 005-Jul-2008
Document Locator helps BMA improve collaboration, ColumbiaSoft 205-Jul-2008
Document Locator helps the company move to digital documents. ColumbiaSoft 205-Jul-2008
Effective IDSE/DBPR Compliance with InfoWater MWH Soft 005-Jul-2008
Optimizing Water & Sewer Infrastructure MWH Soft 105-Jul-2008
Platt Electric goes paperless by scanning the contents of 64 file cabinets into Document Locator. ColumbiaSoft 305-Jul-2008
Tocci Building Corporation ColumbiaSoft 205-Jul-2008
A&D Automatic Gate and Access Maxwell Systems, Inc. 504-Jul-2008
Better manufacturing Lattice3D 204-Jul-2008
Bryant Management Maxwell Systems, Inc. 304-Jul-2008
C.E. Jarrell Contracting Maxwell Systems, Inc. 404-Jul-2008
David A. Nice Builders, Inc. Maxwell Systems, Inc. 404-Jul-2008
DeSantis Commercial, Inc. Maxwell Systems, Inc. 204-Jul-2008
Don Chapin Maxwell Systems, Inc. 204-Jul-2008
Fischer Excavating, Inc. Maxwell Systems, Inc. 204-Jul-2008
Hayes and Lunsford Maxwell Systems, Inc. 204-Jul-2008
J. Marion Bryan & Sons Maxwell Systems, Inc. 304-Jul-2008
K. Alan Co. Maxwell Systems, Inc. 204-Jul-2008
Luken Holdings Maxwell Systems, Inc. 304-Jul-2008
Monroe Plumbing & Heating Maxwell Systems, Inc. 404-Jul-2008
Northern Air Corporation Maxwell Systems, Inc. 204-Jul-2008
Palmetto Paving Corp. Maxwell Systems, Inc. 204-Jul-2008
Primo Electric Company Maxwell Systems, Inc. 204-Jul-2008
Recycled Materials Company, Inc. Maxwell Systems, Inc. 204-Jul-2008
Red Rock Mechanical Maxwell Systems, Inc. 304-Jul-2008
Reducing procurement errors Lattice3D 204-Jul-2008
Tapani Plumbing Maxwell Systems, Inc. 404-Jul-2008
Tri-City Mechanical Maxwell Systems, Inc. 204-Jul-2008
United Maintenance Maxwell Systems, Inc. 204-Jul-2008
Wm. L Robinson Concrete Maxwell Systems, Inc. 204-Jul-2008
IDL Helps Visualize Complex Earth Data in NOAA's "Science on a Sphere™" Project ITT Visual Information Solutions 203-Jul-2008
Intergraph Provides Critical Evidence for Murder Trial Intergraph Corporation 303-Jul-2008
RSI Helps U.S. Army Disseminate Critical Information ITT Visual Information Solutions 103-Jul-2008
Rugged Hardware for Harsh Environments Intergraph Corporation 403-Jul-2008
Visualizing and Analyzing Medical Images from Multiple Modalities Using IDL ITT Visual Information Solutions 103-Jul-2008
Architect – Online data repository BW Document Management solutions 720-Jan-2008
Commercial Real-estate Firm Establishes In-house Scan/Archive Department BW Document Management solutions 520-Jan-2008
Digital Vault Accelerates Construction Firm's Information Flow BW Document Management solutions 420-Jan-2008
Engineering Reclaims Space After Digitizing Drawings BW Document Management solutions 520-Jan-2008
Total 257 links listed, not including links in sub-categories.

3D Geospatial Specialist for Vricon at McLean, VA
Upcoming Events
The Buildings Show at 222 Bremner Blvd Toronto Ontario Canada - Dec 2 - 4, 2015
IIDEXCanada at 255 Front Street West Toronto ON Canada - Dec 2 - 3, 2015
Webinar: Energizing Heritage Conservation with ARCHICAD Point Clouds and BIM at 60 Hickory Drive 1st Floor Waltham MA - Dec 8, 2015
Canon: Productive All in one Large format printing
Bentley:AECOsim - Countless CAD add-ons, plug-ins and more.

Internet Business Systems © 2015 Internet Business Systems, Inc.
595 Millich Dr., Suite 210, Campbell, CA 95008
+1 (408) 850-9202 — Contact Us, or visit our other sites:
TechJobsCafe - Technical Jobs and Resumes EDACafe - Electronic Design Automation GISCafe - Geographical Information Services  MCADCafe - Mechanical Design and Engineering ShareCG - Share Computer Graphic (CG) Animation, 3D Art and 3D Models
  Privacy Policy