All Categories : Case Studies Bookmark and Share

Title : Constellation Energy Upgrades to Electronic Performance Improvement Center Using Bentley’s eB
Company : Bentley Systems
File Name : Constellation_Energy_Case_Study[1].pdf
Size : 382380
Type : application/pdf
Date : 31-Jan-2012
Downloads : 53

If download does not start, click here.
Rate This File
5 Stars
4 Stars
3 Stars
2 Stars
1 Star

The R.E. Ginna Nuclear Power Plant in Ontario, N.Y., is one of five nuclear plants within the Constellation Energy Nuclear Energy Group. Commissioned in 1970, it is one of the oldest U.S. nuclear plants still in operation. As Constellation Energy began aligning business processes and integrating information systems across its fleet, Ginna became the first plant to implement a centralized electronic Performance Improvement Center (ePIC) to replace its existing paper-based corrective action program.
User Reviews More Reviews Review This File
Bentley:YII conference 2016

Featured Video
GIS Analyst for City of Elk Grove at Elk Grove, CA
Upcoming Events
Bentley System's Year in Infrastructure Conference at London United Kingdom - Nov 1 - 3, 2016
The YEAR IN INFRASTRUCTURE Conference at Hilton London Metropole London United Kingdom - Nov 1 - 3, 2016
2016 Design-Build Conference & Expo at Caesars Palace Las Vegas NV - Nov 2 - 4, 2016
GRAPHISOFT: ARCHICAD download 30-day FREE trial
Bentley: YII 2016
TurboCAD pro : Start at $299 - Countless CAD add-ons, plug-ins and more.

Internet Business Systems © 2016 Internet Business Systems, Inc.
595 Millich Dr., Suite 216, Campbell, CA 95008
+1 (408)-337-6870 — Contact Us, or visit our other sites:
TechJobsCafe - Technical Jobs and Resumes EDACafe - Electronic Design Automation GISCafe - Geographical Information Services  MCADCafe - Mechanical Design and Engineering ShareCG - Share Computer Graphic (CG) Animation, 3D Art and 3D Models
  Privacy Policy