All Categories : Case Studies Bookmark and Share

Title : Managing a Multifaceted Project with Vectorworks Architect
Company : Nemetschek VectorWorks
Date : 16-Jan-2010
Downloads : 6

Rate This File
5 Stars
4 Stars
3 Stars
2 Stars
1 Star

The Inotera Headquarters and Production Facility is nothing like your typical office building. When the owner of a silicon wafer fabrication facility in Taipei wanted a new home for its production plant and office space, tec Architecture had to think outside the box—quickly. The challenge was to reinvent the traditional office building model to make an architectural and cultural statement.
User Reviews More Reviews Review This File
Featured Video
Jobs
Senior Structural Engineer for Design Everest at San Francisco, CA
Mechanical Engineer for IDEX Corporation at West Jordan,, UT
Business Partner Manager for Cityworks - Azteca Systems, LLC at Sandy, UT
GIS Analyst II for Air Worldwide at Boston, MA
Upcoming Events
32nd RCI International Convention and Trade Show at Anaheim Convention Center Anaheim California - Mar 16 - 21, 2017
2017 Spring BIMForum at Sheraton San Diego Hotel & Marina San Diego California - Apr 3 - 5, 2017
GRAPHISOFT: ARCHICAD download 30-day FREE trial
Graphisoft ARCHICAD  Download a 30-Day FREE trial
TurboCAD pro : Start at $299
CADalog.com - Countless CAD add-ons, plug-ins and more.



Internet Business Systems © 2016 Internet Business Systems, Inc.
595 Millich Dr., Suite 216, Campbell, CA 95008
+1 (408)-337-6870 — Contact Us, or visit our other sites:
TechJobsCafe - Technical Jobs and Resumes EDACafe - Electronic Design Automation GISCafe - Geographical Information Services  MCADCafe - Mechanical Design and Engineering ShareCG - Share Computer Graphic (CG) Animation, 3D Art and 3D Models
  Privacy Policy