Hodgetts + Fung Board the Hyperloop Transportation Technologies Design Team

Renowned architects Hodgetts + Fung look to the future by adding their experience in transportation design as official architects of the JumpStartFund’s Hyperloop Transportation Technologies track and station scheduled to begin construction in 2016


CULVER CITY, Calif. Sep 25, 2015 -- Known for innovative projects and the design of world renowned facilities like the new Hollywood Bowl, architects Craig Hodgetts and Hsinming Fung announced their addition to the growing list of the Hyperloop Transportation Technologies team. In designing a test track station for the projected new community of Quay Valley, Craig and Ming will be working with land planners, entertainment providers and local authorities to create an entirely unprecedented transportation experience.

“As architects we’ve always looked to the future,” says Craig. “We are looking forward to being part of the team and working on a truly remarkable innovation in transportation and design.” 

Hodgetts + Fung’s experience in transportation design with hybrid mentality has been a passion since the 1960s, when Craig was an automotive engineer, and envisioned the Landliner, a high-speed solution to urban congestion for the Bos-Wash corridor, which became a cover story on New York Magazine.

“Craig has been instrumental in advancing the Hyperloop project,” said JumpStartFund and Hyperloop Transportation Technologies CEO Dirk Ahlborn. “The addition of Ms. Fung and the rest of his talent at their world-famous firm are most welcome additions to our growing roster of impressive team members.”

In August 2015, JumpStartFund’s Hyperloop Transportation Technologies announced that 400 team members were currently engaged in the project, including professionals at Oerlikon Leybold Vacuum, inventors of vacuum technology, and AECOM, the world’s largest construction engineering firm. Originally envisioned by Elon Musk, Hyperloop is a revolutionary transit system that would transport passengers and cargo between cities at 760 miles an hour. The Quay Valley test track will be built on a five-mile stretch between Los Angeles and San Francisco, beginning in 2016. 

www.hplusf.com

• • • • • • • • • •

Contacts:

Dana Nichols
Hodgetts + Fung| Design and Architecture
5837 W. Adams Blvd Culver City, CA 90232
P | 323.937.2150
Email Contact
www.hplusf.com

 




Review Article Be the first to review this article
Featured Video
Jobs
Senior Structural Engineer for Wiss,Janney, Estner Assoicates, Inc at houston, Texas
BIM Manager for Eagle Point Software Corporation at Dubuque, Iowa
Mechanical Engineer for Allen & Shariff Corporation at Pittsburgh, Pennsylvania
Geospatial Analyst/Programmer for LANDIQ at Sacramento, California
Product Manager for CHA Consulting, Inc. at Boston, Massachusetts
Software Developer for CHA Consulting, Inc. at Norwell, Massachusetts
Upcoming Events
Bentley Institute Learn Conference for ProjectWise in London at Millennium Gloucester Hotel 4-18 Harrington Gardens Kensington, London United Kingdom - May 9 - 10, 2018
AEC Next Technology Expo + Conference & SPAR 3D Expo + Conference at Anaheim Convention Center Anaheim CA - Jun 5 - 7, 2018
HxGN LIVE 2018 at The Venetian Las Vegas NV - Jun 12 - 15, 2018
Boston Lights 2018 at THE WESTIN BOSTON WATERFRONT 425 Summer Street Boston MA - Nov 13, 2018
Canon: oce crystalPoint
Bentley: -YII 2018 Awards
CADalog.com - Countless CAD add-ons, plug-ins and more.



Internet Business Systems © 2018 Internet Business Systems, Inc.
25 North 14th Steet, Suite 710, San Jose, CA 95112
+1 (408) 882-6554 — Contact Us, or visit our other sites:
TechJobsCafe - Technical Jobs and Resumes EDACafe - Electronic Design Automation GISCafe - Geographical Information Services  MCADCafe - Mechanical Design and Engineering ShareCG - Share Computer Graphic (CG) Animation, 3D Art and 3D Models
  Privacy PolicyAdvertise