With over 30 years of AEC experience, Mr. Mays is part of the core team driving the AEC industry strategy at Dassault Systèmes. He was the General Manager for North America at Graphisoft, and served as CIO at NBBJ Architects where he led the firm’s transition to BIM in the 1990s. The 3 Building Parts Best Suited for PrefabricationFebruary 12th, 2015 by Patrick Mays, AIA
Prefabrication is an important tool for those practicing industrialized construction. But not everything on a project is delivered more efficiently with prefabrication. Some components or elements of a building are more suited for prefab than others. Click to Tweet: “3 Building Parts Standardized building systems, complex assemblies, and repetitive subcomponents of a building are three examples of applications likely to be successful with prefab. 1. “Unnoticed” Building SystemsCommodity assemblies – parts mostly required by code – often go unnoticed. These building systems don’t make or break the finished project, and so they are more price-sensitive than other systems.
Fire stairs, elevators, plumbing, heating and cooling, and ADA-compliant spaces are examples of building systems that could easily be prefabricated, ordered directly by the owner, and delivered to the worksite ready to be installed. 2. Complex SystemsHigh-end, intricate elements of a building, for example a unique façade system or other stand-alone component, may be more successfully installed if panelized and prefabricated off the job site. 3. Components of a BuildingRepetitive subcomponents can make up 75% of a project in some types of buildings. For example, patient rooms in hospitals, guest bathrooms and kitchenettes in hotels, classrooms in schools, and labs in research facilities are subcomponents that are replicated over and over again within the building. Components that make up certain building types can be built offsite more efficiently at scale, and installed on site more quickly. When planning a project, don’t assume that prefab is an all or nothing proposition. Some parts of a building are much better suited to off-site fabrication than others. These prefab components will end up being delivered in less time, and at much higher quality, with as much as 30% savings. Click to Tweet: “Prefab will deliver in less time, Related Resources:Lean Construction Industry Solution Experience from Dassault Systémes Industrialization of the Construction Industry Whitepaper Lean Construction: Advanced Project Delivery Whitepaper Lean Construction Smart Market Report Tags: Prefabrication Categories: AEC, Dassault Systèmes, Industrialized Construction, Lean Construction |