Open side-bar Menu
 3DEXPERIENCE Construction

Archive for June 18th, 2015

Five Steps to Industrialized Construction

Thursday, June 18th, 2015

 

This post is an excerpt from the paper, “Industrialization of the Construction Industry,” by Dr. Perry Daneshgari and  Dr. Heather Moore of  MCA Inc.

In today’s construction environment the value transferred to the customer for every dollar spent is only around 46 cents.  More than 40% of the tradesmens’ time on a job site is spent on material handling; most of the work on a job site is performed by highly trained and paid skill tradesmen.

Tweet: Over 40% of tradesmen’ time on a #construction job site is spent on material handling @3DSAEC @Dassault3DS #AEC #BIM http://ctt.ec/p2E9U+Click to tweet: “Over 40% of tradesmen’ time
on a #construction job site is spent on material handling”

To achieve comparable results as have been seen in the manufacturing and other industries the construction industry has to take these same five steps:

1. Segregation of Work

The most important contribution of Fredrick Taylor’s work to industrialization of manufacturing was his ability to observe the skilled and unskilled tradesmen at work for a long period of time and being able to breakdown the conducted work. Once the work was broken-down it could then be managed by better management of time, location and contributing resources.

Once the work was visible and understood, it could be designed in the most optimal manner, and segregated amongst the resources available.

Taylor manufacturing resized

“Principles of Scientific Management” by Fredrick Taylor

(more…)




© 2024 Internet Business Systems, Inc.
670 Aberdeen Way, Milpitas, CA 95035
+1 (408) 882-6554 — Contact Us, or visit our other sites:
TechJobsCafe - Technical Jobs and Resumes EDACafe - Electronic Design Automation GISCafe - Geographical Information Services  MCADCafe - Mechanical Design and Engineering ShareCG - Share Computer Graphic (CG) Animation, 3D Art and 3D Models
  Privacy PolicyAdvertise