The following article is excerpted from Civil Design Innovation, a whitepaper developed by Dassault Systèmes and SMEDI. To read more, download the full whitepaper here.
Click to Tweet: “SMEDI uses #BIM platform
to design & deliver Yanggao South Road Tunnel”
Yanggao South Road Tunnel
The reconstruction of the Yanggao South Road covered the area between the current Century Highway and the Pujian Road cross-route bridge, and measures a total of 1.95km (1.2 mi).
The road, tunnel structure, Zhangjiabin Bridge, rain sewage pipeline, traffic sign and lines, signal lights, ventilation, monitoring system, power transmission and distribution, architecture, greening, and related equipment—as well as the initial greening and pipeline relocation—cost RMB ¥1.455 Billion in construction and installation, with the total investment amounting to RMB ¥2.47 Billion [USD $386 Million].
The Dassault Systèmes 3DEXPERIENCE platform version R2015x was selected as the BIM platform for the entire process. SMEDI realized the following benefits by adopting the 3DEXPERIENCE platform: