3DEXPERIENCE Construction Akio Moriwaki
As head of global marketing for the AEC Industry at Dassault Systèmes, Mr. Moriwaki launches and promotes groundbreaking Industry Solution Experiences. He is a member of buildingSMART. Here’s How Syntegrate’s BIM Expertise Made the Admiralty Station Project PossibleAugust 11th, 2017 by Akio Moriwaki
The Admiralty Integrated Station & Sha Tin to Central Link project is the expansion of an existing station on the Hong Kong Mass Transit Railway (MTR) system. As one of the interchange stations on Hong Kong’s busy MTR network, Admiralty Station will need to accommodate 2 new railway lines, the Shatin to Central Link (SCL) and the South Island Line (SIL), making it the first 4-line interchange in the Hong Kong MTR system. This project was further complicated by a demanding construction schedule. Syntegrate, a consultancy specializing in the application of computer-based technology in the Architecture, Engineering, and Construction industry, was responsible for implementing Building Information Modeling, or BIM, on this project. The team utilizes BIM Modeling and Management software tools and provides specialty services to assist in master planning, architectural design, project management, construction, and operations of the built environment. Throughout the expansion of Admiralty Station, which involved construction directly beneath the existing metro lines, the daily operations of the trains had to continue without interruptions. Therefore, in addition to the demanding construction schedule, the operational constraints imposed by the existing station meant that it was necessary to formulate and accurately execute a highly detailed construction plan. Syntegrate responded to this challenge by utilizing CATIA on the 3DEXPERIENCE platform. They visualized construction procedures and periodically incorporated up-to-date as-built models into the BIM environment. With this innovative approach, they produced accurate quantity take-offs, optimized the flow of logistics, and verified construction processes for all stakeholders. As a result, Syntegrate delivered the following value to the project:
With Syntegrate’s help, the 3D model enabled construction workers on-site to foresee subsequent processes. The project stakeholders could also anticipate issues and opportunities early so they could make adjustments in a virtual environment to reduce risk. Related ResourcesDassault Systèmes AEC Industry Solutions Tags: BIM Categories: 3D, AEC, Civil Design, Dassault Systèmes, Infrastructure |