Open side-bar Menu
 ArchShowcase
Sumit Singhal
Sumit Singhal
Sumit Singhal loves modern architecture. He comes from a family of builders who have built more than 20 projects in the last ten years near Delhi in India. He has recently started writing about the architectural projects that catch his imagination.

District Water Board Brabantse Delta in Breda, Netherlands by Kaan Architecten

 
July 26th, 2016 by Sumit Singhal

Article source: Kaan Architecten 

Rather than the arrival of a new office building, the realization of the headquarters of the Brabantse Delta water board signifies a new lease of life for the century-old country estate (first mentioned late 14th century), and an important symbol for the landscape at the South of Breda. With its new premises on the Bouvigne estate, the district water board has provided appropriate continuity for a piece of cultural-historical heritage. The scope of the commission was broad, extending the castle, the gardens and the surrounding structures and grounds, including the chapel and the castle gatehouse.

Image Courtesy © Christian Richters

Image Courtesy © Christian Richters

  • Architects: Kaan Architecten
  • Project: District Water Board Brabantse Delta
  • Location: Breda, Netherlands
  • Photography: Christian Richters
  • Software used: Autodesk AutoCAD, Adobe Suite, and Rhinoceros

Image Courtesy © Christian Richters

Image Courtesy © Christian Richters

The water board takes care of strong, secure dikes and embankments, purifies sewage, regulates the groundwater level and protects nature.

The management area has more than 800.000 inhabitants, 21 municipalities and 25.000 businesses. The big challenge for the water board to unite interests in nature, agriculture, recreation and city life.

Image Courtesy © Christian Richters

Image Courtesy © Christian Richters

Bouvigne is a most appropriate location for this institution.

Initially, the client was hesitant about the idea of establishing its headquarters on the estate. That is understandable: erecting a building between Mast Wood and the valley through which the Mark stream meanders was bound to provoke opposition, especially among the influential residents of the upmarket Ulvenhout residential estate. Moreover, the estate falls under the protection of the heritage authorities, a situation that doesn’t always guarantee a smooth execution of a plan. Accordingly, it was also permitted to submit proposals for the construction of the office on a motorway site or in a nearby office area. In his presentation, Kees Kaan told the client that it would be cowerdly not to opt for the estate, since its significance for the area was evident.

Image Courtesy © Christian Richters

Image Courtesy © Christian Richters

Brabantse Delta received even stronger encouragement for a bold approach from heritage circles. ‘The physical integration with Mast Wood and the recent redevelopment of the stream valley … offer attractive starting points for rebuilding a beautifull, timeless, topographic contrast between wood, nature reserve and cultural monument’. The water board could provide security on this point, was the advice from consultants, supported by landscape architects Frank Meier and Eric Luiten. The latter, as professor in the architectural Faculty at TU Delft is involved in Netwerk Erfgoed & Ruimte (Heritage & Space Network).

Image Courtesy © Christian Richters

Image Courtesy © Christian Richters

The position taken by KAAN nudged the client into a cultural feat: the historical property acquired a fresh perspective. A group of buildings on the estate were to be demolished to allow for a camouflaged insertion of the office building. Bouvigne consists of two parts which form an indissoluble whole, one rectangle containing the castle, water features and the pleasure garden to the north, and another rectangle for more productive use, such as vegetable gardens to the south. The new, long building, which does not project above the crowns of the trees, stands precisely on the dividing line that always existed and picks up a landscape line. The office entrance area forms the link between the two sections of the estate, an axis oriented towards the front door of the castle. This connection to the landscape lines related to the river Mark can also be seen at sanatorium Klokkenberg’ a little further to the South. It positions Bouvigne in a larger landscape framework.

Image Courtesy © Christian Richters

Image Courtesy © Christian Richters

The new headquarters has an eloquent neutrality, to use an oxymoron – in architectural circles a popular figure of speech in which two apparently antithetical concepts are juxtaposed. The programme remained hidden behind screens: a row of limes on the north side facing Île-de- Bouvigne, on the other side a row of slender columns which act as a sundial, owing to light slits in the eaves. A double row of oakes rhymes with the portico. Behind an abstracted pediment above the entrance area, supported by slightly different columns, the archives are kept high and dry.

Image Courtesy © Christian Richters

Image Courtesy © Christian Richters

The spacious, three storey high entrance hall with voids below, houses the reception desk, conference center, information point and the public entry to the estate with several work-related and public functions, such as the ‘brasserie’ (gatehouse), meeting facility (castle), management center (chapel), the romantic wedding venue and the gardens.

Image Courtesy © Christian Richters

Image Courtesy © Christian Richters

The elongated, relatively ‘undeep’ officebuilding has been anchored into the landscape as a monumental and historic gesture with a view on the countryside from anywhere in the building which makes the green surroundings unhinderedly tangible throughout the building.

Image Courtesy © Christian Richters

Image Courtesy © Christian Richters

The linear plan made it possible to position different working typologies strategically and with great variety, while preserving the always direct relationship with the landscape. An alternate layout has been realized: ‘open’, ‘restricted‘ or ‘semi-enclosed‘. This is consistent with the various work-related processes such as collaborating, consulting, knowledge sharing, meeting, concentrating, relaxing, eating and drinking.

Image Courtesy © Christian Richters

Image Courtesy © Christian Richters

Concrete core activation for heating and cooling keep energy consumption to a bare minimum and helophytes filters connected to the canal show how the water board purifies its water. All components of the brief are meticulously elaborated, as can be seen in the decorations in the chapel, in the fit-out of the ‘brasserie’ in the old gatehouse with windows in the end elevation that rhyme with those of the office building, in the sculptures by Stephan Balkenhol marking the entrance, sawn and hacked out of a couple of trees that had to be felled for the construction, and in the walnut orchard for public harvesting in the section for productive use.

Image Courtesy © Christian Richters

Image Courtesy © Christian Richters

Image Courtesy © Christian Richters

Image Courtesy © Christian Richters

Image Courtesy © Kaan Architecten

Image Courtesy © Kaan Architecten

Image Courtesy © Kaan Architecten

Image Courtesy © Kaan Architecten

Image Courtesy © Kaan Architecten

Image Courtesy © Kaan Architecten

Image Courtesy © Kaan Architecten

Image Courtesy © Kaan Architecten

Image Courtesy © Kaan Architecten

Image Courtesy © Kaan Architecten

Image Courtesy © Kaan Architecten

Image Courtesy © Kaan Architecten

Tags: ,

Categories: Autocad, Autodesk, Headquarters, Office Building, Rhinoceros




© 2024 Internet Business Systems, Inc.
670 Aberdeen Way, Milpitas, CA 95035
+1 (408) 882-6554 — Contact Us, or visit our other sites:
TechJobsCafe - Technical Jobs and Resumes EDACafe - Electronic Design Automation GISCafe - Geographical Information Services  MCADCafe - Mechanical Design and Engineering ShareCG - Share Computer Graphic (CG) Animation, 3D Art and 3D Models
  Privacy PolicyAdvertise