This rehabilitation of a modest 1960’s commercial building brings new life to a neglected structure in this coastal college town adjacent to the University of California Santa Barbara. Facade improvements included new fiber cement cladding inspired by retail barcodes and energy efficient storefronts with irregularly patterned mullions. Along the sidewalk raised outdoor dining patios were created with metal enclosures that mimic the storefronts. Inside, mechanical systems were updated along with and access for the disabled. Now the open facades entice passerby while the outdoor dining activities and rhythmic patterns of the new facade enliven the downtown streetscape.
It is indicative that this office is to some extent a return to the roots of cooperation of za bor architects and the largest Russian IT-corporation Yandex. The first office developed for Yandex by za bor architects is in the same building of the Benois business center in Saint Petersburg, but on a lower floor. In 2008 it was a brilliant premiere published by almost all the leading architecture and design media in Russia. The project has picked up many awards. Four years later za bor architects and Yandex had decided to repeat the success on a larger scale – Yandex Saint-Petersburg office II is almost twice as large as the previous one – it houses the entire fourth floor of the building and has a corridor about 200 meters long (total floor area 3310 sqm), but size doesn’t matter, clients wanted an «extraordinary office like no other»
The house is located in a district in the east area of Santiago, and one of its characteristics is the presence of old trees. The spaces are organized in an “H” shaped plant adapted to the lot, having great care for the trees and creating patios that reinforce their presence from the inside.
This was a project in response to the ‘Concours d’idees Allplan’. The aim was to design the Pavilion of France for the Universal Exhibition in Milan in 2015, whose theme is defined as ‘feeding the planet, energy for life’.
Site characterization
The building sit is characterized by its rectangular shape and with east-west orientation, flat until half of the land and there after acquiring a steep slope. The house is inserted in a parcel which determines the rules and the implementation to be adopted.
This substantial 14,190 m2 fitout for 900 staff offered an opportunity to holistically enhance Beca’s engineering and consultancy business, to present a fresh and professional image of their expanding organisation. Beca committed to a significant strategic transformation in changing to an open plan workplace with all staff in one building, and the fitout is designed in response to support a range of ways to work. Distinct zones are layered through the plan for individual and team-based working, transitioning into ‘studio’ spaces – open work areas that facilitate collaboration, creative thinking, and working.
Designed by J. MAYER H., the ‘Schaustelle’ or ‘show site’ will be a temporary pavilion and platform for the four collections housed at the Pinakothek der Moderne.
Munich, 12 July 2012, In an official statement, Dr. Markus Michalke, Chairman of the Pinakothek der Moderne Foundation announced:
The Pinakothek der Moderne is due to close in February 2013 for renovation work and is expected to reopen again in September 2013. The temporary closure has been seen as an opportunity that will give rise to a makeshift exhibition building – the Schaustelle. Set up for the duration of the renovations, it will provide the four collections at the Pinakothek der Moderne with a lively platform to hold exhibitions, workshops, talks, performances, film screenings and video installations and much more besides. The scheme has been initiated by the Pinakothek der Moderne Foundation.
Representative office of the largest Russian IT-company, Yandex in Kazan, is situated on the 16th floor of «Suvar Plaza» business center. With the area of 647 sq.m. it has only 41 working place. The office plan reminds a trapezium, while the midline of a trapezium is a corridor, leading from the main entrance to the fire exit.
Construction that consists of a self-supporting galvanized steel structure, parallel to the existing dividing wall, with ground floor plus eight levels above, accessed via a staircase, dedicated to include flower plants lining the facade, like a vertical garden.
The Green Side-Wall consists of a free-standing structure containing plants that form a protective mass of vegetation against a facade in Barcelona, thus creating a vertical garden.
These public toilets are located at the Synergy Plaza in the Kumutoto Precinct, situated at the northern-most end of Wellington’s waterfront. As well as taking into account practical considerations such as security, hygiene and vandalism, the brief was to create a structure with a sculptural form, something iconic, highly visible and unusual that was also well integrated into the visual and historical context of the surrounding precinct.