Acknowledging the great value of the cultural and architectural heritage that is present all over the site, overlapping time and space in such a meaningful presence, our quest is to create a quiet and cohesive urban environment that would not be over-imposing or disruptive but one that attempts to unify and add structure to the physical frame. From a distance this central zone is very clearly dominated by three major public spaces – the trilogy Syntagma/Panepistimiou Core/Omonia that are linked by a system of large avenues on which Panepistimiou has the greater role. It seems natural that these places should be considered poles of centrality, as they are focus points of historical relevance. Although these spaces are very diverged in terms of functionality and shape, it seems obvious that they are within themselves places of gathering on which all the flows and social expressions are related to.
These neighboring terrace homes are owned by two generations of one family. Both houses were in need of repair and update. HOUSE House is a single building that extends both homes. They are separate homes within one architecture. The new structure runs north/south while the original houses run east/west. The fence between each terrace slides away to create one large backyard.
VENT VERT is Green Wind in French. As the name suggests, the thrust of the design was to add a new spirit of green to not only the new building but also the surrounding commercial environment. The building sits near the end of a busy shopping street called Azabu Juban where green is rather scarce. For this reason, the green façade was employed as an eye-catcher especially in light of the fact that the building stands at the corner of a bend in the street and highly visible from afar on the approach road.
The project is my final year design thesis (2007). The building acts as a catalyst for future development around the abandoned mining lake, and is a reminder of the glory days of tin mining in the country. The program takes visitors through the rich history of tin mining around the country and finally ending the journey in the existing abandoned tin dredge.
Image Courtesy Wan Muhammad Khalis Wan Sabri
Architects: Wan Muhammad Khalis Wan Sabri
Project: Selangor Dredging Tin Discovery Centre
Location: Dengkil, Selangor, Malaysia
Client: Selangor Dredging Berhad
Building type: Visitor Centre, Cultural Centre, Artist Workshop & Gallery
Software used: Vectorworks (drawings & 3d modelling) and Artlantis (3d rendering)
Article source: Peter Stasek Architects + Loftwerk Karlsruhe
A very unusual loft is being created in the Mannheim harbor district. A very unusual loft has been created in the Mannheim harbor district. The complete ajando team will live and work there starting in January 2013. The internationally renowned architect Peter Stasek and the loftwerk architect office located in Karlsruhe are behind the corporate architecture concept of the loft. It was inspired by the quantum physics of Wheeler, the architecture of Josef M. Hoffmann and, of course, the information expertise of ajando.
Munich’s ‘Bau’ trade fair is one of the world’s leading trade fairs for the construction industry. Its particular focus is on building materials. For the ‘Bau 2013’, Armstrong DLW is highlighting its product palette of linoleum and vinyl flooring. The idea is to pursue the twin goals of presenting its new collections and sensitising a younger and inherently more experimental target group of architects to the appeal of these materials. The stand exhibits both the Linea collection, featuring a wide spectrum of wood grain effects, and the Colorette product line, which is distinguished by strong, rich colours.
This scheme’s abstract form references the classic garage format with forecourt. The simple steel frame structure is clad in translucent panels to reduce energy consumption and facilitate productivity. At night, the workshop functions as a light beacon, illuminating the main entrance to the industrial complex. Internally, the building’s skin delivers a defused light, creating a relaxed environment in which to work, uncluttered by the visual harshness of the industrial surroundings.
The site is located in a new residential area on northeast side of Kanmon straits. Clients are born in this area. The family has moved by job transfer frequently, but they bought this land before their retirement and decided to build a house. There is a park on south side of the site, so it gets stable sunlight and broad expanse to the park. On the other hand, they requested privacy because there is much traffic from the park and the street. In addition, the family wanted to enjoy view to KanmonBridge from and a fireworks festival at Kanmon straits the house those are local symbol.
The project to expand a 1970s house recently Acquired Began in July 2010 and was completed in the autumn of 2012. In buying this house in BADEN, the owners wanted to adapt to a new life in the Morbihan by converting an existing dwelling into home energy efficient year using ecological building materials.Close to the sea and ideal base for sailing year, the house was Originally Intended to be a holiday home.
Peter Ruge Architekten sets new standards of sustainability through the design of “Passive Houses”, currently being built in southern China. With a 95% energy saving over that of a conventional Chinese residential building, the Passive House “Bruck” is the first housing of it’s kind to be realized in the countries damp, warm, southern climate. Construction will start in February 2013.
Thermal Structural Physics: Passivhaus Institut Dr. Feist, Darmstadt
Brief: Passive house as a model apartment complex, consisting 36 one room staff flats, 6 two room executive suites and 4 three-bedroom model apartments, entrance hall, common rooms, garage
Scope of services: Establishing the basis of the project, preliminary design, final design, execution documents (HOAI phase 1, 2, 3, 5)
Size: GFA Building: 2.200 sqm
Duration: 2011 – 2013
Completion: 2013
Software used: Rhino and 3dmax for the perspectives and Vectorworks for the drawings