While building information modeling (BIM) was once considered a critical piece in efficiency driving construction project delivery, the truth is that BIM applications have not met the needs of GCs and specialty contractors. After more than a decade in use by architects and engineers, few construction companies can credit cost savings to BIM because the applications are not used in the field.
BIM’s usefulness as a specifications solution for architects does not translate well to construction. A BIM model of a door, for example, may contain sizing, acoustic information, fire performance and other characteristics, but it will not include the granular definitions of components needed to make a purchasing list. As a workaround, contractors are likely to flatten the BIM model into a paper drawing and create a spreadsheet from which to order components.