Open side-bar Menu
 ArchShowcase
Sumit Singhal
Sumit Singhal
Sumit Singhal loves modern architecture. He comes from a family of builders who have built more than 20 projects in the last ten years near Delhi in India. He has recently started writing about the architectural projects that catch his imagination.

Theatre du Chatelard in Ferney-Voltaire, France by Clermont Architectes

 
July 16th, 2011 by Sumit Singhal

Article source: Clermont Architectes

This farm building dating back to the 16th century has a particularly rich history. Today, this adventure is continued by the rehabilitation of the Theatre du Châtelard.  The farm, composed of dwelling places, barns, stables, ovens, gardens and orchards, became Voltaire’s property in 1759; the latter undertook improvements in order to house there the domestics of his nearby castle.

Image Courtesy Daniel Osso

  • Architects: Clermont Architectes
  • Project: Theatre du Chatelard
  • Location: Ferney-Voltaire, France
  • Client: Mairie de Ferney-Voltaire
  • Collaborators: Ion Moreno, Maria Campos Piera
  • Engineers: Bem Ingénierie – Fluitec
  • Economist: Cosinus
  • Photograph: Daniel Osso

Image Courtesy Daniel Osso

Materials/products used in this project :
–          Translucent PV pannels
–          Wood siding and structure (larch)
–          galvanized steel stairs

Image Courtesy Daniel Osso

Requisitioned by the army during the Revolution , the buildings were used as a guard-room and a bakery.  During the 19th century, the farm went back to its agricultural purpose, until it stopped its activity in 1988.  In 1991, the Theatre du Châtelard was created and set up inside the main barn ; it was then closed in 2001, for security reasons.

Image Courtesy Daniel Osso

A project was launched in order to entirely restructure the theater.  The project respects – and takes advantage of – this witness of the local farm architecture. But it is also a modernly equipped facility, in order to face the constraints and the rules of our time.

Image Courtesy Daniel Osso

Because of the operation’s very tight budget (643 000 euros without taxes), the structure plays an important aesthetic role; the materials are often left unfinished, as well as the technical equipment. The project was conducted by the desire to preserve the building’s identity and to minimize the interventions on the outward appearance.  Originally composed of a single wide volume, the space was divided in order to create in the attic a thermal and sound insulator (the building is very close to Geneva’s airport).

Image Courtesy Daniel Osso

An unfinished aspect was intentionally preserved. The existing walls keep the marks of the different interventions (lintels, openings). The original frame and the new floors are also left unfinished, each one expressing its own time and being juxtaposed to the other one without any concerns of camouflage or “harmonization”.

 

Image Courtesy Daniel Osso

Partitions and insulation were painted in dark brown in order to provide an appropriate setting for the performances. As a counterpoint, the ceilings are blood-red, in order to structure the space and to emphasize the visual effect of the ceiling joists. The modularity of the space was particularly studied, the theater structure thus being able to vary depending on the different shows and the purpose of the staging.

Image Courtesy Daniel Osso

Plan

Plan

Plan

Tags: ,

Category: Theater




© 2024 Internet Business Systems, Inc.
670 Aberdeen Way, Milpitas, CA 95035
+1 (408) 882-6554 — Contact Us, or visit our other sites:
TechJobsCafe - Technical Jobs and Resumes EDACafe - Electronic Design Automation GISCafe - Geographical Information Services  MCADCafe - Mechanical Design and Engineering ShareCG - Share Computer Graphic (CG) Animation, 3D Art and 3D Models
  Privacy PolicyAdvertise