Science park – Mechatronik in Linz, Austria by Caramel Architekten

 
January 8th, 2012 by Sumit Singhal

Article source: Caramel Architekten

The program involved designing several individual buildings which would be interwoven as well as tied to the existing University of Linz campus. The plan was to take into consideration the neighboring residential buildings as well as the natural form of the slope and the katabatic winds, which play an important role in keeping the city cool, and the poor condition of the building lot was not to be overlooked either.

Image Courtesy Hertha Hurnaus

  • Architects: Caramel Architekten
  • Project: Science park – Mechatronik
  • Location: Linz, Austria

functions:

  • ground floor: entrance foyer and specialty rooms (research laboratories)
  • Upper levels 1–5: office spaces

Image Courtesy Hertha Hurnaus

Cost:

  • construction unit: 22 million euros without underpass
  • total: according to competition: 70–80 million euros

Deadlines:

  • start of construction: 2nd quarter 2007
  • completion of construction unit 1: october 2009
  • Contracting party, client: BIG bundesimmobiliengesellschaft
  • User: johannes kepler university, linz

Image Courtesy Hertha Hurnaus

Planners involved in the project:

  • Chief planner: caramel architekten ZT gmbh – design participation:
  • sabine aberle, gisela mayr, julia stoffregen, klaus schwarzenegger

Subcontractors (hired by the chief planner):

  • Structural engineering: werkraum ZT gmbh, Vienna
  • Landscape architecture: idealice, alice größinger
  • Building services: planungsgruppe grünbichler
  • Electrical planning: planungsgruppe grünbichler
  • Building physics: ZT krückl, perg

Image Courtesy Hertha Hurnaus

Subcontractors (hired directly by BIG):

  • Geotechnical engineering, site investigation: bodenprüfstelle, linz
  • Hydrology: machowetz, linz
  • Transportation planning: TB kubisch, steyr

Image Courtesy Hertha Hurnaus

With the erection of the “Science Park” in the immediate vicinity of the Johannes Kepler University the objective was to bring together economy and research and draw research expertise to Linz. In keeping with the standards of a modern scientific working climate particular attention was paid to creating open areas between the uniform structures, thus creating spaces to encourage exchange and activity.

In order to avoid an inflexible grid structure, straight lines were bent, thus also making full use of the grounds. In this way a more relaxed structure and a better distribution of the different spatial situations were created.

Image Courtesy Hertha Hurnaus

To plan both outdoor and indoor spatial situations that could potentially serve as meeting points the individual elongated blocks were conceived as two-part buildings. The glazed central area not only allows daylight to enter the lower levels via a large indoor hall but also creates communicative zones.

Image Courtesy Hertha Hurnaus

Finally, the horizontal bending of the elongated blocks arose out of consideration to the existing structures. Moreover, the height of the building corresponds to the upper edge of the slope to the north and at the same time to the eaves of the residential buildings to the south. The subsequent bend in the buildings on the south side, however, results not only out of consideration to the neighbors but plays with the front edge, which, as seen along with all the building sections as a whole, ultimately modulates the overall form.

Image Courtesy Hertha Hurnaus

All in all, it was essential for the project to “crouch” into the landscape. This is why part of the slope was removed to make way for the basement, which houses the special rooms like laboratories and workshops and connects the individual building sections. Above this, hover the office wings between which the landscape flows into the grounds – a measure which was used to overcome the difficult task of tying the new structures to the existing campus, although these two areas are separated by a heavily used road (Altenbergerstraße). On the Science Park side, the grounds have been recessed enough so that one enters the underpass at ground level, following along a gradually sloping ramp that leads through the Park straight up to the buildings on the university campus side. In this way, the connection is at least in part at ground level.

Image Courtesy Hertha Hurnaus

Above this level 0, as it were, extends the cantilevered structure of the first building element (Mechatronik), which forms the actual entranceway to the Science Park.

Due to its enormous span and the deflection, the unit has been designed as a bridge structure, in which two massive cores support a 160-meter-long steel truss frame.

Image Courtesy Hertha Hurnaus

The design of the façade also conforms to the structural system of the truss frame. The parapets are not arranged randomly but have been placed to coincide with the points of greatest deflection. In this way the outward impression is diversified while the interior is marked by greater individuality. A fascinating tension, the effect of which is intensified by the arrangement of the lamellae at different levels and intervals.

Image Courtesy Hertha Hurnaus

Image Courtesy Hertha Hurnaus

Image Courtesy Hertha Hurnaus

Image Courtesy Hertha Hurnaus

Image Courtesy Hertha Hurnaus

Tags: ,

Category: Science Park




© 2024 Internet Business Systems, Inc.
670 Aberdeen Way, Milpitas, CA 95035
+1 (408) 882-6554 — Contact Us, or visit our other sites:
TechJobsCafe - Technical Jobs and Resumes EDACafe - Electronic Design Automation GISCafe - Geographical Information Services  MCADCafe - Mechanical Design and Engineering ShareCG - Share Computer Graphic (CG) Animation, 3D Art and 3D Models
  Privacy PolicyAdvertise