Open side-bar Menu
 ArchShowcase
Sumit Singhal
Sumit Singhal
Sumit Singhal loves modern architecture. He comes from a family of builders who have built more than 20 projects in the last ten years near Delhi in India. He has recently started writing about the architectural projects that catch his imagination.

Tokyo 2020 Olympic Stadium Competition Entry in Japan by Andrea Maffei Architects

 
November 10th, 2012 by Sumit Singhal

Article source: Andrea Maffei Architects

The competition for the New Tokyo National Stadium which began in July and ended in September 2012 asked for a proposal for the 2020 Olympic Games. We made a design whose intention was to allow people to feel very close to the activity within, to the athletes and football players, to the exciting atmosphere in which the spectator is involved directly in the games. At the same time we also wanted to design a space which was flexible, that could accommodate the wide range of sports intended for this kind of building, by focusing specifically on circulation that would make movement easy and fluid. In front of the large stadium area there is a main public space that creates a new Festival Sport Plaza, whose roof protects people from rain and provides shadow in the hot summer months. The space was intended to be used for exterior and extraneous events like concerts, oobon parties, political campaigns, small sporting activities, fairs, and many others.

Image Courtesy via Venti Settembre

  • Architects: Andrea Maffei Architects
  • Project: Tokyo 2020 Olympic Stadium Competition Entry
  • Location: Tokyo, Japan
  • Program: Olympic Stadium – 2020 Olympic Games
  • Client: Japan Sports Council
  • Competition Dates: July – September 2012
  • Architecture Project: Andrea Maffei
  • Design Team: Takeshi Miura, Alessandra De Stefani, Takatoshi Oki, Roberto Balduzzi, Paolo Evolvi, Stefano Bergagna, Pietro Bertozzi, Chiara Zandri / Andrea Maffei Architects
  • Associate Architect: Hiroshi Yoshino, Mitsuyoshi Miyazaki / Yoshino Hiroshi Architect Office structures prof. Massimo Majowiecki / Studio Tecnico Majowiecki
  • Mechanical Systems: Kankyo-Engineering Co., Ltd.
  • Total Area: 301.215 sqm
  • Capacity: 90.000 seats
  • Cost Estimation: US$ 1,300,000
  • Image: via Venti Settembre

Image Courtesy via Venti Settembre

The main roof of the stadium is characterized by a big circular 120m wide aperture that can be kept open or closed when a light dome of steel and fabric is slid into place on binaries. When open, the dome assimilated the Pantheon in Rome. The size of the hole corresponds to the football field below and allows natural light to penetrate and illuminate the grass field and running tracks. This atmosphere is unique in the history of the games, as it will be a new and exciting space for its involved spectators.

Image Courtesy via Venti Settembre

The circulation allows for the people to access the roof via a ramp that circles around the stadium and ends at the top, moving people onto the outdoor tracks, and covered auditorium. For the first time in history, the roof may be used by people to practice sports and watch the many different events that may be unfolding bellow or under the roof’s dome. The intention was to make the structure capable of sustaining, within the limited plot of land, many of the activities which in previous Olympics used to need multiple facilities.

Image Courtesy via Venti Settembre

For the first time in the Stadium many different events can take place simultaneously in different places: the main arena of 80,000 seats, the covered plaza in front, the big roof with sport activities and a movable dome. It is not a fixed sport stadium but a multiple activities complex. In case of football, the main arena can be enlarged to 90,000 seats, by moving 5 meters down the football field and extracting 10,000 additional seats.

Image Courtesy via Venti Settembre

The wooden facade is reminiscent of ancient Japanese architecture, however it is also intended to blend with the forest of columns that surround the structure and hold up the roof, ramp and tracks. In essence, it is a structure of whose like we have not seen before applied to the famous world athletic games.

Image Courtesy via Venti Settembre

Image Courtesy via Venti Settembre

Image Courtesy via Venti Settembre

Image Courtesy via Venti Settembre

Image Courtesy via Venti Settembre

Image Courtesy via Venti Settembre

Image Courtesy via Venti Settembre

Image Courtesy via Venti Settembre

Image Courtesy via Venti Settembre

Image Courtesy via Venti Settembre

Image Courtesy via Venti Settembre

Image Courtesy via Venti Settembre

Image Courtesy via Venti Settembre

Image Courtesy via Venti Settembre

Tags: ,

Category: Stadium




© 2024 Internet Business Systems, Inc.
670 Aberdeen Way, Milpitas, CA 95035
+1 (408) 882-6554 — Contact Us, or visit our other sites:
TechJobsCafe - Technical Jobs and Resumes EDACafe - Electronic Design Automation GISCafe - Geographical Information Services  MCADCafe - Mechanical Design and Engineering ShareCG - Share Computer Graphic (CG) Animation, 3D Art and 3D Models
  Privacy PolicyAdvertise