Open side-bar Menu
 ArchShowcase
Sanjay Gangal
Sanjay Gangal
Sanjay Gangal is the President of IBSystems, the parent company of AECCafe.com, MCADCafe, EDACafe.Com, GISCafe.Com, and ShareCG.Com.

Brent Spence Bridge Replacement in Cincinnati, Ohio by Rosales + Partners

 
May 1st, 2013 by Sanjay Gangal

Article source: Rosales + Partners

The new Brent Spence Bridge will cross the Ohio River next to downtown Cincinnati, Ohio. The new interstate will accommodate multiple lanes for both I-71 and I-75 and will be vital to long-distance state and national commerce.

Image Courtesy Rosales + Partners

  • Architects: Rosales + Partners
  • Project: Brent Spence Bridge Replacement
  • Location: Cincinnati, Ohio ,USA
  • Type: Cable Supported Bridge
  • Cost: $650 Million (estimated)
  • Completion Date: 2020

Image Courtesy Rosales + Partners

The bridge will be a double deck cable supported structure that will clearly announce the entrance to the city from a distance. The main clear span of the bridge is approximately 1000’ (305m) with an exceptional width of approximately 155’ (47m).

Image Courtesy Rosales + Partners

The single tower of the cable stayed bridge will have a height of 500’ (152.5m) making it visible from afar and a counterpoint to the high rise buildings in downtown. The new bridge will clearly mark the river crossing from a distance making it an important landmark and a major thoroughfare for local and regional mobility.

Image Courtesy Rosales + Partners

Image Courtesy Rosales + Partners

Tags: ,

Category: Bridge




© 2024 Internet Business Systems, Inc.
670 Aberdeen Way, Milpitas, CA 95035
+1 (408) 882-6554 — Contact Us, or visit our other sites:
TechJobsCafe - Technical Jobs and Resumes EDACafe - Electronic Design Automation GISCafe - Geographical Information Services  MCADCafe - Mechanical Design and Engineering ShareCG - Share Computer Graphic (CG) Animation, 3D Art and 3D Models
  Privacy PolicyAdvertise