Open side-bar Menu
 ArchShowcase
Sumit Singhal
Sumit Singhal
Sumit Singhal loves modern architecture. He comes from a family of builders who have built more than 20 projects in the last ten years near Delhi in India. He has recently started writing about the architectural projects that catch his imagination.

DLZ Nautilus, Bern in Switzerland by Lindner Group

 
May 12th, 2013 by Sumit Singhal

Article source: Lindner Group

In summer 2011, Lindner Group was commissioned to provide the facade of a new service centre for the company Losinger Marazzi AG. Installation began in November and was completed in April 2012. The total area of Lindner facades installed on this office building is 4,800 m².

Image Courtesy © Pascal Meyer 

  • Architects: Lindner Group
  • Project: DLZ Nautilus, Bern
  • Location: Bern, Switzerland
  • Photography: Pascal Meyer
  • Client: Losinger Marazzi AG Project
  • Architect: Mlzd, Bienne
  • Facade planning: Reba Fassadentechnik AG, Chur
  • Completion date: 2012

Image Courtesy © Pascal Meyer

Scope of works: Facade types and scope

  • 4,800 m² bespoke Lindner facade, surface powder coated
  • 900 individual facade elements including sunblinds
  • Rain screens
  • Ceiling area
  • Maximum sound insulation performance of R‘w = 46 dB
  • Overall facade U-value (Ucw) of 1.0 W/m²K
  • 180 kg vent-opening elements with non-visible hinges

Image Courtesy © Pascal Meyer

Technical details: In order to provide sufficient stability against the vibrations caused by passing trains, the sunblinds were innovatively integrated into the facade profile. As cleaning from the outside adjacent to the railway is not permitted, every element is openable for cleaning purposes, with the hinges being cleverly hidden in the element. As well as the standard facade bracket, customized brackets were also designed to avoid clashing with the building‘s columns.

Image Courtesy © Pascal Meyer

Installation: The panels at the ends of the building are fully glazed black enameled panels. Installation of elements started in January 2012 and was completed in April 2012, with work continuing uninterrupted during the coldest months in temperatures below -10°C.

Image Courtesy © Pascal Meyer

Image Courtesy © Pascal Meyer

Image Courtesy © Pascal Meyer

Image Courtesy © Pascal Meyer

Image Courtesy © Pascal Meyer

Image Courtesy © Pascal Meyer

Image Courtesy © Pascal Meyer

Vertical section : Image courtesy Lindner Group

Image courtesy Lindner Group

Image courtesy Lindner Group

Vertical section of ceiling detail : Image courtesy Lindner Group

Tags: ,

Category: Services Centre




© 2024 Internet Business Systems, Inc.
670 Aberdeen Way, Milpitas, CA 95035
+1 (408) 882-6554 — Contact Us, or visit our other sites:
TechJobsCafe - Technical Jobs and Resumes EDACafe - Electronic Design Automation GISCafe - Geographical Information Services  MCADCafe - Mechanical Design and Engineering ShareCG - Share Computer Graphic (CG) Animation, 3D Art and 3D Models
  Privacy PolicyAdvertise