The Scarborough Civic Centre Branch, the 100th for the Toronto Public Library, demonstrates what a library can be in the 21st century. Technologically adaptable, welcoming to an ever-growing and diverse population, and celebrating design, the branch transcends its primary role as a local community hub and acts as a point of pride for the city at large.
LGA Architectural Partners and Phillip H. Carter architects in joint venture.
Brock James, Partner-in-Charge, LGA Architectural Partners, Danny Bartman, Liana Bresler, Dan Briker, Cynthia Dovell, Ian Huff, Leo Lin, Yvonne Popovska, Amanda Reed, Clara Shipman
Morphosis Architects today marked the official opening of The Emma and Georgina Bloomberg Center, the academic hub of the new Cornell Tech campus on Roosevelt Island. With the goal of becoming a net zero building, The Bloomberg Center, designed by the global architecture and design firm, forms the heart of the campus, bridging academia and industry while pioneering new standards in environmental sustainability through state-ofthe- art design.
Project Designer: Nicolas Fayad, Edmund Ming-Yip Kwong, Jerry Figurski, Jean Oei
Project Team: Christopher Battaglia, Chloe Brunner, Debbie Chen, Chris Eskew, Stuart Franks, Farah,Harake, Clayton Henry, Ted Kane, Hunter Knight, Jongwan Kwon, Ryan Leifield, Simon, McGown, Brian Richter, Go-Woon Seo
The original commission aimed for a fishermen facility made of 20 workshops. But after in-depth analysis of the site, its history, and the municipality needs; BuzzoSpinelliArchitecture proposed to enhance the program by adding a sales area and an urban space.
Following their lead, the general contractor wished to complete this program with an office for the fisherman, another one for the SNSM, and a community hall.
The City of North Vancouver’s 38,000 sq. ft. renovation project expanded the existing 1970’s modern heritage building into a recently vacated library structure, with a new bridging atrium. The design team’s goal was to create a very public building; about the community and for the community. The design is open and transparent. The main link between all departments and the public is found in the 67 metre (220 foot) long atrium space. The design creates a flexible, productive working environment for the diverse services offered to the public in the building, and reinforces the city’s aspirations to showcase their new sustainable city mandate.
Photography by Ema Peter courtesy of MGA | MICHAEL GREEN ARCHITECTURE
In the center of the Bavarian town of Bad Aibling lies Marienplatz, a historic plaza flanked by public, retail and hotel buildings. It is here that the two main streets of the town intersect and where the existing city hall from the 1970s has stood. In recent years, the town of Bad Aibling decided to construct a new city hall as a means by which to further invigorate the centre.
How should we design a place facing the remains of Alcudia’s historical walls? What action to take opposite to the historical fortifications in there since times of Jaume II? A reinterpretation of the walled citadel and the site´s symbolism gave us the key to solve the proposal.
The immediate proximity of the future heart of the city constituted of businesses and dwellings forces us to sanctuarize the square of the City Hall and to distinguish an external extension, a place which offers dignity and readability to the City Hall.
Groupe Dynamite is a women’s clothing retailer operating 315 stores worldwide under two brands, Dynamite and Garage. Located in Town of Mount Royal’s industrial sector, the head office occupies two large industrial buildings with more than 500 employees. Within their walls, the group creates, designs, markets and distributes a constantly evolving collection to a large network of retail stores.
Laying on the pristine context of Polour, overlooking the highest peakof Iran-Mount Damavand-, and responding the climbing potential of the region,a spirited sport facility is imprinted delicately in the rocky lands of Mazandaran.
Being inspired by the geological process of the large-scale movements of the earth‘s crust and its tectonic forces,all end up to initial clues toco-operate for drawing up Polour Rock Climbing Hall.
Certain factors, such as the Business District site in relation to the city, connecting roads, site location and orientation, sunlight, prevailing winds, flows and internal movements of people in the Business District, existing infrastructure, green spaces and public areas, were considered when deciding on aspects such as form, building location in the site, occupation strategy, the difference in levels, the inclined facades, the roof slope, i.e. the overall design.