The new building, part of Nestlés social block at the Granero factory (VI Región – Chile), uses a variety of bioclimatic strategies, within a company policy of rational use of energy resources and economics in the 21th century. These strategies favorite the usage of natural resources, passive ventilation systems, air-condition and cleaning for inside spaces, natural controlled illumination, effective cost savings in the use of hydrological resources (water consumption of restrooms, etc), by trend to find the best sustainability, quality of life, rational use of resources and protection of the environment.
A volume of simple and emphatic architecture, which reinterprets the anonymous architecture of the coastal valleys in the center of Chile. It poses itself above the soft tree-lined areas, peeking gently with its facades of wood and tones that highlight the luminosity of the place. The body melts down as one with the geography and projects the lines of trees upon his facades. Employs sustainable technologies, creating a favorable mood for work and the production of quality olive oil.
A steel cube supported by concrete walls is the image of a bakery company with an industrial process, located in a new area of corporative buildings.
A new industrial concept for a company dedicated to the production of traditional and elaborated bread of massive consumption , incorporating top technology to all panification processes.
Privileged location in a new area of corporative buildings lead us to create an integrated design where volume was favored as an object.
The inauguration for the new headquarters and production complex of Pratic, a company owned by the Orioli brothers and specialized in the design and manufacture of curtain systems, has recently taken place in Fagagna a town located in the province of Udine, in Northern Italy. The complex placed adjacent to the provincial highway that leads from Udine to Spilimbergo, was designed and built by GEZA (architects Stefano Gri and Piero Zucchi). The intervention is composed principally of: a main volume, a parallelepiped with a surface of approximately 10,000 m2 that houses the main productive core; a second volume of about 1000 m2 placed adjacent to the first but rotated 15 degrees in order to align with the highway is dedicated to the offices; a parking lot for 100 cars; a loading dock and service area of approximately 2,700 m2; a garden space of about 33,000 m2. In addition spaces dedicated to communication, showrooms, break rooms and open communal and private areas are housed in the buildings in order to accommodate the daily activities of the workers. The complex, anchored in the industrial zone of the town, is also intimately tied to the surrounding agricultural landscape through different aspects of its design; thus ultimately forming part of the mountain scape characteristic of the region.
Historically, Metalsa began as a family-owned company, founded by Guillermo Zambrano Gutierrez in November 1956, previously named Manufacturas Metalicas Monterrey. The company later entered the automotive industry through a partnership with American firm A. O. Smith and began manufacturing chassis frames for heavy trucks and pickups in the late 60’s. The official name of Metalsa was adopted in the late 70’s and operations started in Apodaca. Metalsa’s successes allowed them to acquire the commercial vehicles business from Tower Automotive expanding to Virginia, and later building facilities in China, Japan and India. Today the company boasts several major automotive corporations as their clients, including Ford and Toyota.
Location: Alianza Centro, Apodaca, Nuevo León, Mexico
Client/Owner: The Proeza Group
Project Team: Lawrence Scarpa, FAIA – Lead Designer, Daniel Poei, Abby Katcher, Oliver Liao, Darien Williams, Jordan Gearhart, Ching Luk – Project Design Team
Landscape: PEG
Engineering:
Structural Engineering: Carl W. Howe Partners, Inc.
Mechanical, Electrical and Plumbing: Cobalt
LEED: Zinner Consultants
Site: A 100,000 square foot vacant parcel located within a new Research and Technology Innovation Park developed by the Mexican government. The site is also adjacent to the Monterrey, Mexico airport and adjoins a natural habitat area.
REHABILITATION OF THE OLD FACTORIES STRUTURES CROS. PHASE I
Faced with the Burgo estuary, along the new promenade stand proud of the old factory Cros structures. The first phase project includes the decontamination of structures and terrain as well as a complete renovation. To undertake this phase structures were settled with pine wooden form work and the roof was recovered ceramic tiles.
In the estate of La Grajera, west of the city of Logroño and only a few yards from the Camino de Santiago, we find the Institutional Winery of La Grajera.
The Project seeks an equilibrium between the need to announce the presence of the winery and the desire to merge with the landscape: the volumes follow the deformations of the land and are interrupted, moving towards the forest, remaining close to its border and thus respecting the existing vegetation.
The context is the industrial area on the outskirts of Adro, a jumble of factories without identity.The client is a solid company that has been handed down four generations of the desire for innovation, precision and respect for the environment. The object of the project is the construction of a vertical tamponage to expand production.
On the east of the site, the elevated road joint between Osaka and Kyoto where the JR Tokaido line is crossing from the west. It is to be seen a widely spreading switchyard on the same direction of the elevated road. The vicinity of the site is an eclectic gathering from small to medium size of factories, warehouses, trade facilities and housings forming which is the mixed landscape of architectural typologies.
The design of this residence involved the rehabilitation of an old brick factory that, with its chimney, was a memory of a recent past of the city of Lagos. the intention was to reflect a strong unity and identity associated with an image of the contemporary and high architectural quality in line with the existing buildings in the adjacent marina.