Located in Caxias do Sul, the building occupies a wide corner, due to the pre-condition of large roads, making them very wide and of great flow. Low-rise and small-scale buildings occupy the surroundings. In this scenario, the building becomes a protagonist, being the focal point for people and vehicles wich pass by.
The commercial building has seven floors: parking basement, three ground floor shops with mezzanine, three floors with four commercial offices each and technical space. The smaller scale of the building (the total constructed area is about 2,000 m²) and the insertion in a corner allowed us to “sculpt” the primary prism and transform it.
The Zemelny Office Building is located close to the Moscow metro station called Ulitsa 1905 Goda. The building is surrounded with the industrial architecture dating back to the last century, while three kilometres away there is the Moscow City business district, and the Zemelny has become a ‘green’ alternative to it.
The tower with a total area of 39000 m2 stands on a 3-floor stylobate and is “enwrapped” with a fishnet diagonal-lattice metal shell. The prototype of this structure is based on the hyperboloid creations by the engineer Shukhov, the author of the Shukhov Radio Tower in Moscow.
The alternation of transparency and opacity on the façade provides the double function of protection and perception of the external space.
A blade of glass and steel, resembling a prow pointing north-west, acts as the fulcrum of the Accenture People Hub building’s architectural composition, one of Accenture’s offices in Italy, a project by Park Associati for Milanofiori Sviluppo (Gruppo Brioschi Sviluppo Immobiliare). Comprising fifteen floors above ground and covering a surface of approximately 31,500 square metres, this building is one of the most notable achievements of the Milanofiori Nord sector in Assago.
Conversion of an old industrial hall into a multi-spatial office environment where a unique history, top-level expertise, and modern technology converge.
Strömberg Park is a culturally and historically valuable industrial milieu located in Vaasa, Finland. The construction of the area began in the 1940’s based on a town plan formulated by Alvar Aalto. Strömberg Park is for the most part owned by the global engineering company ABB.
This 41-story office tower occupies a prominent site directly adjoining the Dalle of La Défense an elevated pedestrian plaza centered on the monumental axis that extends eastward from the nearby Grande Arche through the historic heart of Paris.
The building is positioned to reflect this axial system while respecting the view corridor from the historic center. The office floors rise above a lobby at the plaza level and two lower floors of amenities, including a garden restaurant.
MVRDV has revealed Sun Rock, an operations facility containing offices, a maintenance workshop, storage spaces, and a public gallery for Taiwan’s government-owned power company Taipower. Anticipating Taiwan’s planned transition to green energy, the features of the Sun Rock building, from its shape to its façade, are focused upon generating solar energy as efficiently as possible. The building therefore acts as a definitive statement of intention, and a “manifesto in a building” to communicate Taipower’s goals to the public.
Located at the Changhua Coastal Industrial Park, near to Taichung, the building’s primary purpose is for the storage and maintenance of sustainable energy equipment. The site for Taipower’s new facility receives a significant amount of solar exposure throughout the year, and so the rounded shape of Sun Rock is designed to maximise how much of that sunlight can be harnessed for energy. On the southern side, the building slopes gently downwards, creating a large surface area that directly faces the sun during the middle of the day. At the northern end, the domed shape maximises the area of the building exposed to the sun in the mornings and evenings.
“The staircase we designed is a legible and robust architectural element to convey a strong company identity for one of the largest ship management companies in the world.” – Kenny Kinugasa-Tsui, co-founder of Bean Buro
“This workplace across three floor features artificial skylights and flexible workspaces created at each landing of the staircase to encourage agile working.”– Lorène Faure, co-founder of Bean Buro
As Akamai Technologies’ new global headquarters, 145 Broadway consolidates their workforce from across six disparate locations into a unified vertical campus. Creating connectivity within the building and neighborhood was a defining vision for the design.
As a major infill urban development, the design process for this approx. 482,000 gsf tower in Kendall Square was tailored to directly respond to opportunities created through deep collaboration with the design team and the City of Cambridge. This participatory design process resulted in a confident yet sensitive building that fits within the city scale, inspires employee engagement, and supports innovation.
Recently, a service buildings group of Nantong Urban Agricultural Park has been completed by Z-ONE Architects (a newly emerging studio which specializes in experimental architectural practice in rural China; established in 2020). The project located on the northern suburb of Nantong, Jiangsu, China, with a total construction area of 4552.8m². It took four months from concept design to final completion.
The project includes 3 buildings :a Comprehensive Service Center called “Gather Grain into Granary”, an Exhibition Hall of Rural Life and a public restroom renovation. Considering the project is located in the entrance area, which is an important place for visitors to perceive the whole park, it needs to transition between urban and rural experience, without missing the reflection and reconstruction of contemporary architectural vocabulary.
Today, MVRDV is revealing its design for an office building that will renovate and enlarge one of the last projects completed by celebrated Dutch architect Aldo van Eyck, the Tripolis office complex in Amsterdam. Named Tripolis Park, the project comprises the renovation of the old buildings, a new park, and a new office block that will create a sheltering screen to protect the complex from noise created by the adjacent highway while embracing the Van Eyck-designed buildings behind. Renovation work on the existing buildings will begin next week, with the project scheduled for completion in 2022.