“Building schools means building the future, as youngsters will assimilate and pass on their spatial experience of light, air, simplicity and beauty throughout their lives. The designers were honoured to have the opportunity to deliver creative social impulses of this kind. Following several earlier ‘trial runs’ in the centre of Mortsel (merger of three primary schools), central Antwerp (UIA) and Gasthuisberg hospital in Leuven (midwifery), this fourth winning competition design for a school building is the most expressive to date.
The modernisation project of the D. Dinis Secondary School was particularly pioneering in the context of the reforms being carried out by Parque Escolar, and simultaneously corresponds to a typology that includes around 70% of the secondary schools in Portugal – the pavilion schools.
The Norwegian School of economics has over a longer period, been planning to create a campus, to gather all of their students and staff. They have previously been renting space outside the campus environment for 100 people, space for studying and auditoriums.
Sidwell Friends School, a K-12 Quaker school in Washington, D.C., transformed a 1950s gymnasium into a contemplative space for worship, with additional facilities for art and music instruction. The gymnasium had been used as a makeshift worship space for more than a decade; its location on campus was ideal, its acoustics and architecture were not.
Conveniently located in the centre of Sandnes the school has room for 800 students. The school caters to a variety of academic subjects within media and communication, drawing and design, arts and crafts, music, dance, and drama. The building covers an area of 22.500 m2 including a sports hall, a lecture theatre with 380 seats, miscellaneous audition rooms, and rooms equipped for gymnastics.
The school of the 21st century needs to satisfy a long list of demands, some of which seem at first to be contradictory. It needs to have character and function as an anchoring point within the neighbourhood. It must be multifunctional, flexible, energy-efficient, sustainable, affordable, and possible to build within just a few months. Impossible? No. In fact, it was recently completed: the Integraal Kindcentrum (Integral Child Centre, IKC) Zeeburgereiland in Amsterdam, designed by Studioninedots. The building was opened on 29 November.
The MUCAB complex (Museum, Music School and Center for Local Development for Women and Youth, Daycare/Child Assistance Center), located in the town of Blanca, was designed to be a core for local representation, where a new kind of urban tension is created to foster activity in the environs of the Segura River.
PROJECT TEAM, collaborators: Juan García Carrillo. (architect), Francisco Pérez. (technical architecture),Manuel Gil de Pareja. (technical architecture), Mar Melgarejo, Arancha Fernández. (architects), Julián lloret.
In order to resolve the implantation of the building on the site, we started setting the sports track with the right orientation.The track is placed on the level + 41,90 m, optimizing the topography modification works. The north side of the lot is located on the level + 41,50 m, where we find the entrance to the administration, the nursery and primary areas.Thus, we try to not create large differencesfrom one level to the next, thinking in the shortage of the users.
Inspired by Yale School of Management’s reinvention of business school education and pioneering integrated curriculum, the new Edward P. Evans Hall combines world-class teaching facilities with inspirational social spaces. The design unites Yale’s faculty departments in a single location for the first time and brings a high level of transparency to the traditionally enclosed college courtyard, creating a green heart for the campus community, which is visible throughout the school.
herbertarchitekten are currently planning a boarding school for the Bildungs- und Technologiezentrum für Elektro- und Informationstechnik e.V. in Lauterbach, Germany . The new building replaces an existing building.
A previously conducted feasibility study brought the result that the reconstruction and modernization of the existing building is not economical.