Article source: bauzeit architekten
The site of the forestry center extends on both sides of the ‘Reuchenette’ road. To facilitate it’s function, the program’s content focused on only one side. Following the topography of the land, two buildings form an elongated space ending with a court for the maneuvers. The single level building dominates the main street façade and differs, both in form and aspect, from the urban architecture. Its envelope is made of rough and untreated strips of wood. It generates a oriented vertically texture, that dialogues with the forest structure and filters the light and the external views.
- Architects: bauzeit architekten
- Project: Forestry Installation Building
- Location: Biel, Switzerland
- Software used: AutoCad 2015