Open side-bar Menu
 ArchShowcase

Posts Tagged ‘Figueres’

Dr.Masdevall Primary Health Care Center in Figueres, Spain by BCQ Arquitectes

Wednesday, September 18th, 2019

Article source: BCQ Arquitectes

The building is understood as a “pure box” in which health and sanitary services can be developed. The façades are made of prefaricated white concrete pieces that form a translucid skin for the building.

The construction of this healthcare center was postponed for some years until 2013, when the project had to be adapted, as initially it was designed to place other facilities of the Government of Catalonia. The program of the building is organized on four floors: two above ground level, that correspond to the main and more public program of the health care center, and two basement floors, the B-1 destined to technical premises and personnel use and the B-2 to parking. The new primary health care center has a total of 22 consultation rooms (one double), a multipurpose area with four care points and an area of continuous attention with 4 care boxes. There is also an area for offices, area for health education, storage and staffing area.

The rest of the site is considered as a landscaped area with a gentle slope towards the building without getting in touch, thus generating an English patio in order to ventilate the two basement floors naturally.

Image Courtesy © Lorenzo de Nicola (BCQ)

  • Architects: BCQ Arquitectes
  • Project: Dr.Masdevall Primary Health Care Center
  • Location: Figueres, Spain
  • Photography: Lorenzo de Nicola (BCQ)
  • Software used: Autocad
  • Author: BCQ arquitectura barcelona (Toni Casamor, David Baena, Manel Peribáñez, Maria Taltavull)
  • Energy Efficiency Label: A
  • Client: Infraestructures.cat / Servei Català de la Salut
  • Constructor: COMSA Constructora de Obras Municipales SAU
  • Construccions: Fusté SA
  • Building Services Engineering: E3G Enginyeria i Energia
  • Structural Engineering: STATIC Enginyeria
  • QS, Construction Manager: AT3 Oller-Peña, E3 Solinteg
  • Construction Date: 19 june 2018
  • Budget: 2.884.753 €
  • Built Area: 2.917 m2
  • Public Space Area: 2.347 m2

(more…)




© 2024 Internet Business Systems, Inc.
670 Aberdeen Way, Milpitas, CA 95035
+1 (408) 882-6554 — Contact Us, or visit our other sites:
TechJobsCafe - Technical Jobs and Resumes EDACafe - Electronic Design Automation GISCafe - Geographical Information Services  MCADCafe - Mechanical Design and Engineering ShareCG - Share Computer Graphic (CG) Animation, 3D Art and 3D Models
  Privacy PolicyAdvertise