Article source: Dehullu Architects
The works that have been conducted are part of a masterplan that was developped in 2007.
Due to the growing needs of the city services, the Town Hall was looking for an extension of their site. In order to anticipate these growing needs a masterplan was developped. In this plan the historic site of a 19th century flax-factory was incorporated in the new site of the Town Hall. Redevelopping the new site, a new entrance building was designed, centrally located between two existing historically valuable buildings.
- Architects: Dehullu Architects
- Project: The Town Hall
- Location: Marktstraat 29, 8530 Harelbeke, Belgium
- Software used: Autocad (autodesk)
- Structural engineer: Dehullu Architects & Lieven Vangeluwe
- Engineer HVAC & electricity: Studiebureau Clauwaert
- Surface: 1000 m²
- Construction year: 2010 – 2011