Open side-bar Menu
 ArchShowcase

Posts Tagged ‘Hood River’

Outpost in Hood River, Oregon by skylab

Friday, August 21st, 2020

Article source: skylab

Outpost is a phased, hybrid structure merging recreation, retail and work environments to foster and reinforce a sense of community in a developing section of Hood River. As part of the city’s new Waterfront Masterplan, Outpost will eventually become a 60,000-square-foot development a neighborhood of buildings that will functionally connect the city with the Columbia River waterfront. The site, formerly home to an industrial wastewater treatment and processing facility, largely underutilized the waterfront but will now become a new paradigm for future development in the region.

Image Courtesy © Stephen Miller

  • Architects: skylab
  • Project: Outpost
  • Location: Hood River, Oregon
  • Photography: Stephen Miller
  • Project Team: Jeff Kovel, Brent Grubbk, David Suttle, Nathan Cox, Kyle Norman, Marian Jones, Joshua Jewett, Amy DeVall
  • Client / Developer: Key Development
  • Contractor: Celilo Construction
  • Civil Engineer: Vista GeoEnvironmental Services
  • Structural / Electrical Engineer: Valar Consulting Engineers

(more…)

Music And Science Building in Hood River, Oregon, USA by Opsis Architecture

Thursday, May 16th, 2013

Article source: Opsis Architecture

The Music and Science Building is the latest addition to the Hood River Middle School campus in Hood River, Oregon. It provides a new facility to serve the school’s remarkable and unique Outdoor Classroom Project based on the principles of Permaculture.

Image Courtesy Opsis Architecture

  • Architects: Opsis Architecture
  • Project: Music And Science Building
  • Location: Hood River, Oregon, USA
  • Project Owner: Hood River County School District
  • Project Completion Date: September, 2010
  • Project Site: Previously Undeveloped Land
  • Project Type: Education – K-12 School
  • Project Site Context/Setting: Urban
  • Building Gross Floor Area: 7,200 square feet
  • Other Building Description: New
  • New: 66.0%
  • Renovation: 34.0%
  • BOMA Floor area method used: No
  • Hours of Operation: 7:30am – 4:00pm
  • Total project cost at time of completion, land excluded: $2,300,000.00

(more…)




© 2024 Internet Business Systems, Inc.
670 Aberdeen Way, Milpitas, CA 95035
+1 (408) 882-6554 — Contact Us, or visit our other sites:
TechJobsCafe - Technical Jobs and Resumes EDACafe - Electronic Design Automation GISCafe - Geographical Information Services  MCADCafe - Mechanical Design and Engineering ShareCG - Share Computer Graphic (CG) Animation, 3D Art and 3D Models
  Privacy PolicyAdvertise