Article source: Metropolis Communication
The new building of the CHU de Poitiers gathers all the administrative services, which were originally scattered around the campus of la Milétrie, in a single place. The personnel, whose members have been working without ever meeting or seeing each other, are henceforth grouped together in the same building.
- Architects: Atelier d’architecture Brenac + Gonzalez et associés
- Project: An agora at the heart of the CHU of Poitiers
- Location: Poitiers, France
- Photography: Sergio Grazia & Stefan Tuchila
- Project management: CHU of Poitiers
- Project manager: Stefan Tuchila
- Landscape architect: Agence Hilaire
- Cost control: Oteis
- Structural engineering: Oteis
- Utilities engineers: ITF
- Acoustical engineers: Sigma Acoustique
- Façade engineers: Van Santen
- Lighting design: Lumesens
- Cost: €16m excl. VAT
- Energy performance: RT 2012
- Surface: 11,000 m²
- Calendar: delivered in 2016