Open side-bar Menu
 ArchShowcase

Posts Tagged ‘Saint-Ouen’

Between Two Patios in Saint Ouen, France by OVERCODE architecture urbanism

Sunday, July 23rd, 2017

Article source: OVERCODE architecture urbanism

The project aims at improving the living space of a house that sits on a 100% built terrain. The house is located in a dense neighborhood near Paris, Saint Ouen (93).

The existing site was divided into 3 parts: a parking space on the street level, an old workshop in the center and a house at the back. The house has been recently restored and shelters on the ground floor the living spaces, which were very dark due to the warehouse in front of it.

Image Courtesy © David Foessel

  • Architects: OVERCODE architecture urbanism
  • Project: Between Two Patios
  • Location: Saint Ouen (93), France
  • Photography: David Foessel
  • Lead Architects:  Alejandro GARCIA MARTA / Claire GARCIA
  • Contractors: LISANDRE
  • Gross Built Area (square meters or square foot): 88 m² (extension)
  • Completion Year: 2015 – 2016

(more…)

« DOCK EN SEINE » OFFICES in France by Franklin Azzi Architecture

Tuesday, May 26th, 2015

Article source: Franklin Azzi Architecture

The Saint-Ouen Docks site has an industrial port activity past, which decay had given way to industrial waste land, and has now become the ideal strategic location for an Eco-Neighbourhood. This labelled project is an example of an environment-driven project.

The main volume of the ‘Dock en Seine’ building comprises six stories. In order to meet the necessary environmental objectives, and to overcome constraints related to streamlining of the programmes, this building was tightly packed.

Image Courtesy © LUC BOEGLY

Image Courtesy © LUC BOEGLY

  • Architects: Franklin Azzi Architecture
  • Project: « DOCK EN SEINE » OFFICES
  • Location: 1-5 rue Paulin Talabot 93400 SAINT OUEN France
  • Photography: LUC BOEGLY
  • SURFACE AREA: Floor area : 16200 m²
  • COST (EXC. TAX) : 36 M €
  • DATE: 2010
  • Architects collaborators: Paul Armand Grether, Adrien Pineau
  • Environmental Engineer: Green Affair

(more…)

Zero Energy school in SAINT-OUEN, FRANCE by Mikou Design Studio

Sunday, December 22nd, 2013

Article source: Mikou Design Studio

The Docks school in Saint Ouen is in a strategic urban location, in the middle of the Zac des Docks mixed development area, which an exemplary case of sustainable urban development.

Located in the middle of an urban complex composed mainly of high-rise office blocks and housing, it will also be visible because of its roof, a fundamental feature of the project onto which the openings of neighbouring buildings face.

Image Courtesy © FLORIAN KLEINEFENN

  • Architects: Mikou Design Studio
  • Project: Zero Energy school
  • Location: SAINT-OUEN, FRANCE
  • Photography: FLORIAN KLEINEFENN
  • Client: City of Saint-Ouen
  • Programme: Elementary school, preschool, sports and recreation center, restaurant, administration
  • Surface: 4 820 m²
  • Status complete: october 2013
  • Team: Salwa Mikou – Cecile Jalby – Miguel Allen Valença
  • Structural Engineer: BERIM
  • Services Engineer: BERIM
  • Quantity Surveyor: SLETEC
  • Main Contractor: URBAINE DES TRAVAUX / GROUPE FAYAT

Gavroche Centre for Children in Saint-Ouen, France by SOA Architectes

Thursday, November 10th, 2011

Article source: SOA Architectes

The Gavroche centre for children is a cultural and educational facility situated in the heart of the Victor Hugo development. The latter is part of a large urban renewal scheme consisting principally of housing, offices and commercial buildings organised around the Victor Hugo Garden.

Image Courtesy Clément Guillaume

  • Architects: SOA Architectes
  • Project: Gavroche Centre for Children
  • Location: Saint-Ouen, France
  • Client: City of Saint-Ouen
  • Project Management: SOA (commissioned architect), Starck (feasibility consultants and economists), GA (acousticians)
  • Budget: 2.49 M€HT
  • Net Floor Area: 851m²
  • Environmental Aspects and Performance Standards: HQE environmental approach, THPE certification
  • Contract: Full contract
  • Schedule Studies: 40 weeks, site work 70 weeks
  • Completed: 2011
  • Photography: © Clément Guillaume

(more…)




© 2024 Internet Business Systems, Inc.
670 Aberdeen Way, Milpitas, CA 95035
+1 (408) 882-6554 — Contact Us, or visit our other sites:
TechJobsCafe - Technical Jobs and Resumes EDACafe - Electronic Design Automation GISCafe - Geographical Information Services  MCADCafe - Mechanical Design and Engineering ShareCG - Share Computer Graphic (CG) Animation, 3D Art and 3D Models
  Privacy PolicyAdvertise