Article source: Max-A
The fast paced project was developed in four months and built in 8 months.
Iansa is the principal producer, distributor and seller of sugar in Chile. The company was looking to house the production of their new sweetener Cero K. A 30 x 50 mts two-story 8.5mt high warehouse was the starting point to house the various programmatic requirements. The actual productive process in developing the sweetener became the core of the project resulting in a 4- story 14mt high central structure cladded in Transparent Alveolar Sunlite Polycarbonate that would pierce the main volume functioning both as an independent and cohesive element at the same time.
- Architects: Max-A
- Project: Cero K
- Location: Km. 385 Ruta 5 Sur. San Carlos, Chile
- Photography: Erieta Attali
- Architect team: Max Noguera, Alejandra Marambio
- Area: 3.500 sqm + 10.000 sqm Landscape Architecture
- Year: 2014