Article source: Paolo Didonè
School building built in 50 days for the earthquake emergency in Emilia Romagna.From the front plaza, the building presents itself as concrete wall that acts as a fence. A strong wall, imposing, rough, that gives the idea of strength and the sense of protection to parents who bring their children to school.
- Architects: PAOLO DIDONE’, SERGIO DE GIOIA ,FABRIZIO MICHIELON
- Project: PENCIL BOX
- Project team: Arch. Paolo Didonè, Arch. Sergio de Gioia, Arch. FabrizioMichielon
- Location: San Felice sul Panaro MO, Italy
- Software used: Archicad
- Structural engineering team: Ing. BeniaminoDidonè, Ing. Bruno Gonzato
- M&E engineering team: Riccardo Baggio, Studio Gasparotto
- Construction schedule:
- 20/07/2012 deadline competition
- 10 days to prepare construction drawings
- 17/08/2012 beginning of construction
- 07/10/2012 inauguration
- Building area: 1.380 sqm
- Total cost: 1.472.892 €
- Year: 2012