Article source: NAM Arq + NUA arquitectures
The proposal is based on the will by the City Hall of Enabling the lobby of the current Teatre de Torredembarra. We believe that the Torrencs deserve much more than a hallway enabled in an abandoned theater. Regardless of its current state and its architecture, the building is now a faulty reference point in a gray period for the history of Torredembarra.
- Architects: NAM Arq + NUA arquitectures
- Project: Teatre Auditori Torredembarra
- Location: Torredembarra, Spain
- Photography: José Hevia
- Collaborators: NUA arquitectures
- Engineer: STC ENGINYERIA Enric Sanz Ariño (Enginyer Tècnic Industrial)
- Quantity Surveyor: Alberto Viñas Ciurana
- Promoter: Ajuntament de Torredembarra
- Built Surface (m2): 1501m2
- Year of Construction: December 2016