Open side-bar Menu
 ArchShowcase
Sanjay Gangal
Sanjay Gangal
Sanjay Gangal is the President of IBSystems, the parent company of AECCafe.com, MCADCafe, EDACafe.Com, GISCafe.Com, and ShareCG.Com.

Tech901 in Memphis, Tennessee by Archimania

 
August 16th, 2017 by Sanjay Gangal

Article source: Archimania

Tech901, a nonprofit organization, trains new tech workers to take on the diverse challenges of the IT industry and provide growth resources for local employers. They required a new space for collaboration, capable of adapting to serve multiple functions related to the information technology industry.

Image Courtesy © Hank Mardukas

  • Architects: Archimania
  • Project: Tech901
  • Location: Memphis, Tennessee, USA
  • Photography: Hank Mardukas
  • Construction Cost: $702,997 or $143/sf.
  • Building Area: 4,930 sf.

Image Courtesy © Hank Mardukas

A dynamic collaboration zone established the design concept. This zone is made up of a long poured-in-place concrete table with power and data capability embedded into 40’ long six inch strip of walnut. A contrasting homasote wall surface helps to separate this collaborative space from the lounge spaces, and works to achieve optimal acoustics for discussion and concentration. A linear light overhead lines up with the power and data slots, as well as with the power nine logo at entrance. This space accommodates break out spaces for students to use between classes, offers space for temporary workstations, a surface for tech start-up company meetings and acts as a serving table for public events.

Image Courtesy © Hank Mardukas

Image Courtesy © Hank Mardukas

Extending the design emphasis on collaboration, a conference room doubles as small training, testing or war room. Glazing is used to partition smaller offices to achieve openness and light to pass through the space. 42” high film allows partial privacy and effectiveness in the office spaces. Walls with marker board paint surround informal meeting places, and a tectum bridge was developed to mask exposed mechanical and electrical systems nonprofit’s unique new home, a recently renovated Sears distribution facility that was vacant for 20 years.

Image Courtesy © Hank Mardukas

Image Courtesy © Hank Mardukas

The final construction cost is $702,997 or $143/sf. The total building area is 4,930 sf. Consultants for the project included OGCB for engineering and Pro Tec Fire Systems Inc. for Fire Protection. Grinder Taber & Grinder, Inc. was the general contractor for this project. All photos by Hank Mardukas Photography.

Image Courtesy © Hank Mardukas

Image Courtesy © Hank Mardukas

Image Courtesy © Hank Mardukas

Image Courtesy © Hank Mardukas

Image Courtesy © Hank Mardukas

Image Courtesy © Hank Mardukas

Image Courtesy © Hank Mardukas

Image Courtesy © Hank Mardukas

Image Courtesy © Hank Mardukas

Image Courtesy © archimania

Image Courtesy © archimania

Contact archimania

Tags: ,

Categories: Conference Center, Offices, Training centre




© 2024 Internet Business Systems, Inc.
670 Aberdeen Way, Milpitas, CA 95035
+1 (408) 882-6554 — Contact Us, or visit our other sites:
TechJobsCafe - Technical Jobs and Resumes EDACafe - Electronic Design Automation GISCafe - Geographical Information Services  MCADCafe - Mechanical Design and Engineering ShareCG - Share Computer Graphic (CG) Animation, 3D Art and 3D Models
  Privacy PolicyAdvertise