Open side-bar Menu
 ArchShowcase
Sumit Singhal
Sumit Singhal
Sumit Singhal loves modern architecture. He comes from a family of builders who have built more than 20 projects in the last ten years near Delhi in India. He has recently started writing about the architectural projects that catch his imagination.

Conversion of ÉTS’s Dow Planetarium in Montreal, Canada by Menkès Shooner Dagenais LeTourneux Architectes

 
February 4th, 2019 by Sumit Singhal

Article source: v2com

On December 11, the new Centech premises were officially inaugurated in the former Dow Planetarium by the Director General of the École de technologie supérieure, Mr. Pierre Dumouchel, and by the Director of Technological Entrepreneurship and Innovation and Centech Executive Director, Mr. Richard Chénier, in the presence of the Parliamentary Secretary to the Minister of Innovation, Science and Economic Development, Mr. David Lametti, the Minister of Education and Higher Education, Mr. Jean-François Roberge and the Head of the Smart City, Information Technology, Innovation and Advanced Education Executive Committee for the City of Montreal, Mr. François William Croteau.

Image Courtesy © Stéphane Brügger

  • Architects: Menkès Shooner Dagenais LeTourneux Architectes
  • Project: Conversion of ÉTS’s Dow Planetarium
  • Location: Montreal, Canada
  • Photography: Stéphane Brügger
  • Client: École de technologie supérieure (ÉTS)
  • Landscape Architecture: NIP Paysage
  • Partner in Charge: Anik Shooner, architect
  • Lead Designer: Jean-Pierre LeTourneux, architect
  • Project Manager: Julie Morin, architect
  • Team: Mehand Aziz, Frédérick Dumas, Marie-Eve Éthier Chiasson, Sylvain Gagné, Pierre Gervais, Marc-Antoine Grondin, Mario Isa, Claude Labbé, Louis Laperrière, Gaspard Marier, Anne-Marie Nguyen, Joanne Parent, Charles Laurence Proulx, Gaétan Roy, Cuong Tran.

Image Courtesy © Stéphane Brügger

  • Structure: SDK
  • Mechanical: Electrical | Bouthillette Parizeau et Associés
  • Civil: GHD
  • Glazing: CPA Verre Structurel inc.
  • Acoustician: SNC-Lavalin
  • Entrepreneur: QMD
  • Site Area: 6,000 m²
  • Building Area: 2,000 m²
  • Completion Date: 2018

Image Courtesy © Stéphane Brügger

Image Courtesy © Stéphane Brügger

Closed since 2011 after 45 years of existence and transferred to the École de technologie supérieure (ÉTS) by the City of Montreal, the conversion project by Menkès Shooner Dagenais LeTourneux Architectes aimed to rehabilitate this iconic building located at 1000 St. Jacques in Griffintown, in the heart of the Quartier de l’Innovation to welcome Centech, a business incubator. Founded by ÉTS, Centech is a non-profit organization that aims to support technology companies by promoting their economic development and technology transfer.

In the spirit of creating synergies between the university community, the business community, the citizens and the ÉTS community, the new vocation of the Planetarium commissioned the typology of spaces: spaces to encourage encounters, collaboration and reflection linked to tools and advanced technologies, spaces of social diversity and exchange platforms for sharing knowledge.

Image Courtesy © Stéphane Brügger

Image Courtesy © Stéphane Brügger

Design approach and architectural challenges

The main architectural challenge met by Menkes Shooner Dagenais LeTourneux Architectes was to find a way to bring light into the heart of this building designed and intended, by definition and function, to be both obscure and opaque while preserving the memory and the nature of the place, inscribed in the imagination of Montrealers.

The choice to develop the project around the concepts of revolution (about an axis) and the circular shape, imposed by the intrinsic nature of the building, was decisive. Inspired by the perpetual movements of the universe and by the curious complexity of ancient instruments such as the astrolabe or the Orrery machine that translate it, the team of architects transformed the former Dow Planetarium not only into a place that allows to see and explains the cosmic movement, but into a dynamic place which uses it. The era of observation having gone by, this building becomes a generator, accelerator and source of inventions.

Image Courtesy © Stéphane Brügger

Image Courtesy © Stéphane Brügger

Beyond the materiality, the architects have thus favored the formal language to make the movement and this acceleration real and perceptible: from the gears that recall walls composed of a juxtaposition of vertical slats to the concentric circles which are superimposed in the plan, everything is about mechanical rotation and spinning.

The center of the building is an open circular space accessible on all sides and that controls the entire spatial organization of the building. Designed to be the heart of the accelerator in the image of a crucible of innovation and announcing the premises of what will be created in this place, it is intended for unplanned encounters and opportunities that are often at the origin of the greatest discoveries.

Image Courtesy © Stéphane Brügger

Image Courtesy © Stéphane Brügger

The mechanics of the rest of the building are entirely articulated around this central space. Similar to the ingenious principle of watchmaking and the cogwheel, a concentric circulation path leads to the café, the meeting space and the ideation room that wrap around and revolve about a solidary and precise mechanism.

Attached to this rotational movement along the main axis of the building, spaces intended for businesses that will accompany creators on their journey of technological creation complete this clever device.

Image Courtesy © Stéphane Brügger

Image Courtesy © Stéphane Brügger

Special Technical Features

  • Curved glass walls:Complex work to realize and some walls, acting both as partitions and guardrails (great height), required oversized glass panels.
  • Use of curved laminated timber: Used both as a structural and finishing component in the two monumental staircases.
  • Polished concrete slab: The ventilation and all other electromechanical components built into the slab required tight and constant coordination during construction.
  • Electromechanical components: They are all located below the floor slab. This approach made it possible to free up the existing caisson ceilings and allow full-height glass walls.
  • Acoustics: Acoustic foam and panels were integrated into the particular volumetry related to the previous use of the premises.

Image Courtesy © Stéphane Brügger

Tags: ,

Categories: Building, Building Campus, Center, Community Centre




© 2024 Internet Business Systems, Inc.
670 Aberdeen Way, Milpitas, CA 95035
+1 (408) 882-6554 — Contact Us, or visit our other sites:
TechJobsCafe - Technical Jobs and Resumes EDACafe - Electronic Design Automation GISCafe - Geographical Information Services  MCADCafe - Mechanical Design and Engineering ShareCG - Share Computer Graphic (CG) Animation, 3D Art and 3D Models
  Privacy PolicyAdvertise