The dynamics and future urban density of the district, as well as the orientation of the site, the vastness of the sky and the proximity to the water are the prerequisites for the implementation of the project. The aim is to create a modern working environment that gives this special place a strong identity, in particular by linking architecture and landscape. The project participates in the development of this new district and dialogues with the important surrounding buildings, the shopping center and the Heaquarter of Icade which are also structured around the channel Darse.
This project is to make headquarters and exhibition centers for complex furniture company, Nefs. Nefs is South Korean company with unique design philosophy. The company is growing as a complex furniture firm, launching office furnitures as well as kitchen furnitures. The projact began when the headquarters moved to a 30-year old building with exposed concrete exterior, built in 1984, located in the side of Dosandaero.
Guida Moseley Brown Architects (GMB) were selected by long time collaborator for China-based architectural projects, the Suzhou Industrial Park Design and Research Institute (now The ARTS Group), to provide design services for the interior architecture, furniture, and lighting design of all of the highly “public” spaces in their new mixed-use multiple-form headquarters in Suzhou.
The Global Headquarters located in New York City. Located in the historical twin gothic towers that compose Trinity Centre located in the vibrant and ever changing Financial District. The new space will house 250 employees. Having mainly northern light to work with we selected a bright pallet including natural ash wood, the company’s pallet of black and white plus brushed brass accents in light fixtures and hardware elements to accomplish a strong interior space. We allocated resources to where they were most needed, including a welcoming lobby/lounge space that portrays the company’s graphic mastery into architectural elements using ash wood louvered panels and glass as the main characters.
The commission consists on the design of the new headquarters of a technological company: an open-plan office for 50 people, with three meeting rooms, lecture area, two little cubicle for individual use, and numerous spaces for workers to interact. In definitive, an innovative environment that empowers creativity and communication.
Making the most of the original characteristics of the premises, the final target of the project is to achieve a totally continuous space, both at visual and accessible levels.
Anytime you have to design a place to work, able to communicate its company philosophy and foster its activity development, it is an atractive and difficult challenge; but if this office is going to be your new headquarters, this challenge gets huge and powerful.
For us, this project for GANA’s new headquarters emerged full of ideas and illusion, based on a place with great location and possibilities. Features as the traditional flooring tiles from the 30’s, views to Santiago’s church, or the access from Alcazabilla street, make of this project a valuable opportunity. Thus, the key of this design is to empower the existing elements, as an oposition to the contemporary elements required for the activity itself.
A project designed by a team under the direction of the Brno based young architecture studio CHYBIK+KRISTOF has recently won the international competition for the new administrative centre of the Czech Forestry Commission in Hradec Králové. The winning proposal is a two-storey building on the edge of an existing forest, that uses wood extensively as construction material – as requested within the competition. The concept is based on incorporating the forest landscape into a five-finger building to create new relations between the inside office and the outside forest landscape. A nature trail surrounding the building allows to explore the different forest ecotypes, designed by Tomas Babka and breathe.earth.collective.
Tags: Czech Republic, Hradec Králové Comments Off on Czech Forestry Commission campus in Hradec Králové, Czech Republic by Chybik+Kristof Architects & Urban Designers
The Ordre des infirmières et infirmiers du Québec (OIIQ) traded its Westmount offices for a building that is better suited to their needs in Montréal’s Angus Technopôle. The architectural firm Lemay aimed for a design that is completely suited to the OIIQ’s activities, values and contribution to the health sector. This project, with its innovative building materials, follows the principles of sustainable development.
Apple today announced that Apple Park, the company’s new 175-acre campus, will be ready for employees to begin occupying in April. The process of moving more than 12,000 people will take over six months, and construction of the buildings and parklands is scheduled to continue through the summer.
Envisioned by Steve Jobs as a center for creativity and collaboration, Apple Park is transforming miles of asphalt sprawl into a haven of green space in the heart of the Santa Clara Valley. The campus’ ring-shaped, 2.8 million-square-foot main building is clad entirely in the world’s largest panels of curved glass.
The existing headquarters of the Agglomeration community has been established in Bayonne since 1990, in a building located in the heart of a wooded acre in its southern part, accessible from the avenue Foch located below.
The project had several objectives:
. To come up with a boardroom that could welcome all councilors and the public
. To offer additional workspaces for the different services.
. To fortify the Agglomeration community dynamism through the figure of a contemporary extension.