This design for a sports complex and an indoor swimming pool is the third in a series of sports projects that follow a common thread of operations around an initial concept of ‘constructing the void’, in resonance with the concept of the void in the plastic world constructed at the end of the 20th century.
Atelier PRO designed the new sports complex Bosbadhal in Emmeloord with an outspoken, sporty character, bringing cohesion between the outdated sports centre and swimming pool with several new functions. New additions include a large sports centre and lobby, the latter bringing structure to the various sports facilities. The most important intervention was to provide the old sports centre and new additions with one continuous façade, thereby connecting the mismatching facades and outdated architecture. In this way, the separate buildings become transformed into one sculpture.
Architects:Atelier PRO (Dorte Kristensen and Menno Roefs)
Project: Bosbadhal
Location: Boslaan, Emmeloord
Photography: Dirk Verwoerd
Size: 7.579 m² (5,243 m²Construction and 2,197 m² renovation)
Assignment: 2010
Design periode: 2010-mei 2012
Construction periode: June 2012-August 2013
Client: Gemeente Noordoostpolder
Interior architect: Susan Vlemminx
Project leader: Hans TakDesign teamAllard de Goeij, John KoksSite supervisionHans Tak General contractorAannemingsbedrijf Draisma
Total building Costs: € 6,248,000,- (All amounts excluding vat, remunerations, costs of the land, layout, connecting costs; inclusive risk of price increases, wages, materials, delivery a price level).
This design research was undertaken as a part of Master’s programme in Sustainable Tall Buildings at the University of Nottingham, which is also accredited to CTBUH ( Council on Tall Buildings and Urban Habitat)- Chicago.
Recent years have seen unprecedented growth in the construction of tall buildings, with more, and taller, skyscrapers being constructed than at any other time in history.
The project provides a new vision of sports and environment. It combines youth education and growth with Spezia Calcio’s athletic needs, always respecting the context and the local resources.
The renovation of the sports center “Ferdeghini”, with minimal building’s footprint, high energetical efficiency and sensorial comfort, designed to become the “home” of the youth sector of the historic Company Spezia Calcio.
At the core of the urban renewal project for the Mireuil district of La Rochelle, “La Queue du Lézard” (“The Lizard’s Tail”) is a complex of local community amenities which is part of a plan proposed by ANRU (the French National Agency for Urban Renewal) developed together with landscape designers from the In Situ firm. A community centre, city sports grounds and a games library are grouped together in a 200 m long narrow strip made up of alternating built elements and voids.
Located at the heart of the ‘Butte Rouge’ garden city in the Paris suburb of Châtenay-Malabry, the Léonard de Vinci sports complex houses a multipurpose sports hall, a dojo and annexes.
The project can be divided into two main sections:
The base of the building which emerges from the park. The low height of the base is in keeping with the existing buildings and forms an extension of the greenery that runs from the garden-city through to the green roof;
A ‘wooden lantern’, which forms the bulk of the sports hall and sits on top of the large green roof.
The project focuses the attention of the African and International communities. This interest is represented by the lines connecting each African capital in Brazzaville. These generators form on the plot a beam of guidelines as a first filter that allows organizing the circulation areas of the program.
This project is part of a 22-acre urban renewal plan, connecting an Asian city with its major sea port. Its goal is to revitalize a depressed area by catalyzing growth powered by a new soccer stadium and mixed-use development. The design team carefully integrated the stadium’s site and program to respond to its urban context. An existing multi-modal transit station became a critical anchor in the northwest corner.
We thought of sport fields and green spaces with some buildings near them and not of the contrary. The 120.000 m2 plot had strong vegetation and big drops sloping down to a nearby water course. The first thing we tried was to fit in the required four football grounds with the obligatory north – south orientation. The two public football grounds were placed five meters lower than the two training fields to be adapted to the plot.
The park and terrace are situated in Bucharest, Romania, at Olimpia Sport Center. The owners wished to transform their common exterior space into a green open space, divided in two related major functions, where they can relax, walk or eat after sport training and after work. Total area of the project is aprox. 1000 sqm.