Production facility and office building for Schiebel Elektronische Geräte GmbH in Wiener Neustadt, Austria by project A01 architects

 
August 6th, 2017 by Sumit Singhal

Article source: project A01 architects 

“Schiebel Elektronische Geräte GmbH” arranged a strategy competition in summer 2005 for a production hall with an integrated office building, which should represent the identity of the international aviation company. Because of a nearby testing area in close proximity of an airfield, the site in Wiener Neustadt was chosen as a ideal location. The design of project A01 architects ZT GmbH won the competition and the architects were commissioned to the design the building, the interior and to conduct the construction process. The work started in fall 2005 and lasted until summer 2006. The completion of the interior was finished in 2007. The building is composed of two parts: The office unit is arranged lengthwise facing the street and the production hall is located next to the airfield. The office area holds the major administrative functions of production, marketing, research and education. The meeting room is attached to a generous deck for visitors, which is used for airshows. The function of the employee‘s area was considered to be important and accordingly arranged with an own terrace accessible from the lunchroom. The production area contains two thousand square meters. The hall holds not only an area for assembly and fabrication work, but also an area for design, development and attendance. The autonomous helicopters are developed and manufactured with the latest production processes. The innovative concept and design of the camcopter was awarded with the „Staatspreis für Design 2005“, the highest Austrian design award, and is distributed all around the world.

Image Courtesy © project A01 architects

  • Architects: project A01 architects
  • Project: Production facility and office building for Schiebel Elektronische Geräte GmbH
  • Location: Wiener Neustadt, Austria
  • Client: Schiebel Elektronische Geräte GmbH
  • Project management: Leopold Skalsky
  • Project management interior design: Mag. Irene Schiebel
  • Design team project A01: Arch. D.I. Andreas Schmitzer, Arch. D.I. Maria Planegger, Arch. Sebastian Michalski, Mag. arch Günther Dreger
  • Engineering: D.I. J. Gritsch
  • Building services: FEMACON Bauconsult GmbH

Image Courtesy © project A01 architects

  • Site: 3.000 m²
  • Floor space:
    • Production area: 2298 m²
    • Office space: 1613 m²
    • Overall: 3911 m²
  • Converted space: 3529 m²
  • Competition: June 2004
  • Planning started: September 2004
  • Building finished: September 2006

Image Courtesy © project A01 architects

Image Courtesy © project A01 architects

Image Courtesy © project A01 architects

Image Courtesy © project A01 architects

Image Courtesy © project A01 architects

Image Courtesy © project A01 architects

Image Courtesy © project A01 architects

Image Courtesy © project A01 architects

Image Courtesy © project A01 architects

Image Courtesy © project A01 architects

Image Courtesy © project A01 architects

Image Courtesy © project A01 architects

Image Courtesy © project A01 architects

Image Courtesy © project A01 architects

Tags: ,

Categories: Office Building, Office space, Offices, Production Hall




© 2024 Internet Business Systems, Inc.
670 Aberdeen Way, Milpitas, CA 95035
+1 (408) 882-6554 — Contact Us, or visit our other sites:
TechJobsCafe - Technical Jobs and Resumes EDACafe - Electronic Design Automation GISCafe - Geographical Information Services  MCADCafe - Mechanical Design and Engineering ShareCG - Share Computer Graphic (CG) Animation, 3D Art and 3D Models
  Privacy PolicyAdvertise