Former power plant transformed into the multi-tenant Innovation Powerhouse. A transformation from a pure, brute, raw and heavy industrial complex – in size and volume completely unsuitable for office use – into a comfortable, breathing, spacious, fresh and young work environment.

Image Courtesy © Tycho Merijn

  • Architects: Atelier van Berlo in collaboration with Eugelink Architectuur & De Bever Architecten
  • Project: Innovation Powerhouse
  • Location: Eindhoven, Netherlands
  • Photography: Tycho Merijn
  • Developer: Geva Vastgoed
  • Size: 11.000 m2
  • Period: 2015 – 2018
  • Original construction: 1953 – 19872

Image Courtesy © Tycho Merijn

The Innovation Powerhouse is an ecosystem for the innovative industries. A centre of creativity; a hyper-modern, multi-tenant building where different companies meet, inspire and stimulate innovation. Situated on Strijp-T, the out of use power plant is an iconic building, a landmark of Eindhoven. Built in four stages, from 1953 till 1972, the power plant used to provide Philips factories with power through coal, gas and later oil.

Design-driven innovation agency van Berlo initiated the transformation, while in search for their own new headquarters. They envisioned a unique working space, an open ecosystem focused on collaboration, something more than just their own new headquarters. It would be an ecosystem for different innovative companies, universities, partners, clients, and visitors to work together and create the innovations that shape the future.

Image Courtesy © Tycho Merijn

Image Courtesy © Tycho Merijn

The two main points of departure for the design were to maintain the building’s innate architectural qualities and to incorporate this vision of open innovation. Throughout the design this idea of connectives was essential. The architects wanted the companies to constantly meet, to create an almost effortless inspiration of one another, which was translated into a vibrant centre.

To create this vibrant centre, the architect created a clear-cut in the building, a straight line through the heart spanning among others the original central backbone, a 5-meter wide high-rise where the cole chutes still hang at 28-meter hight. Next to this central backbone, the roof is opened up by a skylight spanning the full length, bringing light into the otherwise dark centre of the building and revealing the magnitude of the old heavy concrete structure. In addition, this skylight gives a peek at the facade, allowing all who view it to experience the sheer height of the midpoint.

Image Courtesy © Tycho Merijn

Image Courtesy © Tycho Merijn

Due to a change in power fuelling, the original design was never finished. Since there was no longer a need for cole chutes, the 5-meter wide high-rise was never finished. Inspired by the original drawings, the architects added a steel vertical garden to the central high-rise, giving the building its originally intended symmetrical look. This vertical garden with meeting rooms, a glass elevator and emergency exit follows the lines and rhythm of the original architecture. The open, transparent and green appearance hints at a new sustainable green energy production.

Image Courtesy © Tycho Merijn

Image Courtesy © Tycho Merijn

The symmetrical look is finished by a glass extension at the back of the building. It follows the lines and rhythm of the building, but through a minimalistic detailing and modern materials, it indicated clearly a new phase for this impressive building.

The other interventions, such as the small windows for light in the offices and the main entrance, are kept small, to ensure that the monumental industrial character of the building stays visible. Within the renovation, there was also great attention for sustainability. Due to HR + glass, solar panels, newly isolated walls and roofs, the building now has an A+ energy label.

Image Courtesy © Tycho Merijn

Image Courtesy © Tycho Merijn

Image Courtesy © Tycho Merijn

Image Courtesy © Tycho Merijn

Image Courtesy © Atelier van Berlo

Image Courtesy © Atelier van Berlo

Image Courtesy © Atelier van Berlo

Image Courtesy © Atelier van Berlo

Image Courtesy © Atelier van Berlo

Image Courtesy © Atelier van Berlo

Tags: ,

Categories: Building, Office Building, Office space, Offices, Power Plant




© 2024 Internet Business Systems, Inc.
670 Aberdeen Way, Milpitas, CA 95035
+1 (408) 882-6554 — Contact Us, or visit our other sites:
TechJobsCafe - Technical Jobs and Resumes EDACafe - Electronic Design Automation GISCafe - Geographical Information Services  MCADCafe - Mechanical Design and Engineering ShareCG - Share Computer Graphic (CG) Animation, 3D Art and 3D Models
  Privacy PolicyAdvertise